HomeMy WebLinkAbout0117352-Plumbing
e
OSHKOSH
ON THE WATER
Job Address 1315 MORGAN AVE
CITY OF OSHKOSH
No
117352
PLUMBING PERMIT -APPLICATION AND RECORD
Owner STEVEN R HABERKORN
Create Date 11/1812005
Plan
Category 410 - Residential-Interior
Contractor WATTERS PLUMBING
Bathtub 0 Shower ~ WaterSoftner 0 Wait.St. 0
Whirlpool 1 Floor Drain 0 Local Waste 0 Ice Chest 0
Lavatory 2 Lndry Tray 0 Clothes Wshr 1 Exam Sink 0
Toilet 1 Disposal 0 Bidet 0 Sculry Sink ~
Res. Sink ~ Dishwasher 0 BeerTap 0 Hand Sink 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0
Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink ~
Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink 0
Roof Drain 0 Ejector/Grind ~ Drink Ftn 0 Serv Sink 0
Misc. 0
Fixtures
Shamp Sink ~
FlrlWst Sink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec 0
Ice Maker 0
Gar Drain 0
Soda Disp 0
0
~
~
0
0
~
0
0
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Use/Nature
of Work
r;~- œ.=m~-
Size
Material
Sanitary Sewer
Storm Sewer
Water Service
Type # Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$42.00 0 Permit Voided I
Parcelld #
1226630000
$0.00
Permit Fees
Valuation
$12.500.00
Plan Approval
Date 11/1812005
Issued By
In the performance of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this pennit application within an easement, the City strongly urges the pennit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 118
AgenUOWner
MENASHA
WI 54952 -0118
Telephone Number 920-733-8125
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Penmit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.