Loading...
HomeMy WebLinkAbout0117352-Plumbing e OSHKOSH ON THE WATER Job Address 1315 MORGAN AVE CITY OF OSHKOSH No 117352 PLUMBING PERMIT -APPLICATION AND RECORD Owner STEVEN R HABERKORN Create Date 11/1812005 Plan Category 410 - Residential-Interior Contractor WATTERS PLUMBING Bathtub 0 Shower ~ WaterSoftner 0 Wait.St. 0 Whirlpool 1 Floor Drain 0 Local Waste 0 Ice Chest 0 Lavatory 2 Lndry Tray 0 Clothes Wshr 1 Exam Sink 0 Toilet 1 Disposal 0 Bidet 0 Sculry Sink ~ Res. Sink ~ Dishwasher 0 BeerTap 0 Hand Sink 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink ~ Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink 0 Roof Drain 0 Ejector/Grind ~ Drink Ftn 0 Serv Sink 0 Misc. 0 Fixtures Shamp Sink ~ FlrlWst Sink 0 Catch Basin 0 Wash Ftn 0 Urinal 0 Standp Rec 0 Ice Maker 0 Gar Drain 0 Soda Disp 0 0 ~ ~ 0 0 ~ 0 0 Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Use/Nature of Work r;~- œ.=m~- Size Material Sanitary Sewer Storm Sewer Water Service Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $42.00 0 Permit Voided I Parcelld # 1226630000 $0.00 Permit Fees Valuation $12.500.00 Plan Approval Date 11/1812005 Issued By In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this pennit application within an easement, the City strongly urges the pennit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 118 AgenUOWner MENASHA WI 54952 -0118 Telephone Number 920-733-8125 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Penmit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.