Loading...
HomeMy WebLinkAbout0117349-Building (patio work) e OSHKOSH ON THE WATER Job Address 446 W 19TH AVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 117349 Designer Owner TIMOTHY 0 NEUBAUER Create Date Category Contractor OWNER 11/18/2005 140 -Interior Remodeling Zoning . Building Plan Type 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Size Unfinished/Basement ------2 Sq. Ft. Rooms 0 Height ------2 Ft. Finished/Living ------2 Sq. Ft. Bedrooms ------2 Stories Garage ------2 Sq. Ft. Baths ------2 0 Projection Canopies 0 Signs ------2 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ---.!1 # Structures ---.!1 Use/Nature fSFRI Gutting the rear sun room and installin9 new insuiation and drywall. Installing a repiacement window and patio docr (same size and of Work ocation). HVAC Contractor Electric Contractor Plumbing Contractor Fees: Valuati n Issued By: v $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date~ FinaIlO.p.~ 0 Permit Voided Parcelld # 1405710000 in the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and secu e any necess ry approvals before starting such activity. ,. t.-... Signature Da~ 11- /ð'- ð$ AgenVOwner Address 17E OSHKOSH WI 54902 - 6866 Telephone Number To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.