HomeMy WebLinkAbout0117336-Building (roof)
~
OSHKOSH
ON THE WATER
Job Address 224 STATE ST
CITY OF OSHKOSH
No
117336
BUILDING PERMIT - APPLICATION AND RECORD
Owner GANNETT MIDWEST PUBLISHING INC
Create Date
11/17/2005
Designer
Contractor
LAKEWOOD ROOFING
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
--'1 Sq. Ft.
--'1 Sq. Ft.
Rooms
Height 0 Ft.
D Projection I
Finished/Living
Bedrooms 0
Stories
Canopies 0
Signs
--'1
Garage
--'1 Sq. Ft.
Baths
Foundation
. Poured Concrete 0 Floating Siab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
~
Use/Nature COMMERCIAL / TEAR OFF & REPLACE EXiSTING ROOFiNG ON GARAGE, WOOD DECKiNG TO BE REPLACED AS NEEDED, NO
of Work STRUCTURAL CHANGES
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$11,000.00 Plan Approval
$0.00 Permit Fee Paid
$79.00 Park Dedication
$0.00
Issued By:
Date 11/17/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0200200000
In the performance of this work I agree to perform ail work pursuant to ruies governing the described construction.
While the City of Oshkos s no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permi ap cati wit. easement, the City strongiy urges the permit applicant to contact the easement
:;~:e:::::nd to secu a p rovals ore starting such activity. Date II ~l /65
/ /
Agent/Owner
Address P.O. BOX 15
WINNEBAGO
'!"!- 54985 - 0015 Telephone Number
235-1955
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.