HomeMy WebLinkAbout0117333 P
G
OSHKOSH
ON THE WATER
Job Address 1923 MITCHELL ST
CITY OF OSHKOSH
PLUMBING PERMIT. APPLICATION AND RECORD
No
117333
Contractor LUDWIG'S PLUMBING
Category 411 - Residential-Water Heaters
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 0
Res. Sink 0
Bar Sink 0
Water Heater 1
Site Drain 0
Roof Drain 0
Misc. 0
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
0
0
0
0
0
0
0
0
0
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Use/Nature
ofWork
FR/lnstall gas water heater: (Debit acct)
Sanitary Sewer
Size
Storm Sewer
Water Service
Valuation
$600.00
Plan Approval
Issued By
$0.00
Owner THOMAS E JACOBS
Create Date 11/17/2005
Plan
0
0
0
0
0
0
0
0
0
Wait.SI.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
0
0
0
0
0
0
0
0
0
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap 0
RPZValve 0
EyeWashStatn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Material
Permit Fees
Shamp Sink ~
FlrlWst Sink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec ~
Ice Maker 0
Gar Drain 0
Soda Disp 0
Type
#
Conn. Type
0
0
0
0
0
0
0
0
0
0
Parcelld #
1216160000
$20.00 D Permit Voided I
Date 11/17/2005
WI 54901 - 0000
AgenUOwner
OSHKOSH
In the performance of this work, I agree to perform all work pursuant to ruies governing the described construction.
While tI1e City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perfonm the work
described in this permit appiication within an easement. the City strongly urges the penmit appiicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Date
Address
1903 ASHLAND AVE
Telephone Number
231-5770
Signature
To schedule inspections please call the Inspec1ion Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.