HomeMy WebLinkAbout2005-Building (alterations)
e
OSHKOSH
ON THE WATER
Job Address 432434 N MAIN ST
CITY OF OSHKOSH
No
117332
BUILDING PERMIT - APPLICATION AND RECORD
Owner TOO MAR PROPERTY MANAGEMENT
Create Date
11/10/2005
Contractor
R J ALBRIGHT INC.
Designer
Category
205 - Alteration Amusement, Social, Recreation
Plan 09-89-1005
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Canst:
Size
Unfinished/Basement ~ Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths ~
D Projection I
Canopies 0
Signs
0
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Required
Flood Plain -
# Dwelling Units 0
Height Permit
# Structures
Park Dedication
~
Use/Nature
ofWork
avem / Alterations to expand tavem into adjacent tenant space, remodel interior of both spaces for Tavem use.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valu~
Issued By:
$80,000.00 Plan Approval
$0.00 Permit Fee Paid
$304.00 Park Dedication
$0.00
Date 11/17/2005
Final/O.P. 00/00/0000
D PennitVoided I
Parcelld # 0400880000
In the performance of this work I agree to perform all work pursuant to ruies governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this pennit application within an easement, the City strongly urges the permit applicant to contact the easement
hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 5711 GREEN VALLEY RD
Agent/Owner
OSHKOSH
WI 54904 - 0000
Telephone Number
231-8635
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.