Loading...
HomeMy WebLinkAbout2005-Building (alterations) e OSHKOSH ON THE WATER Job Address 432434 N MAIN ST CITY OF OSHKOSH No 117332 BUILDING PERMIT - APPLICATION AND RECORD Owner TOO MAR PROPERTY MANAGEMENT Create Date 11/10/2005 Contractor R J ALBRIGHT INC. Designer Category 205 - Alteration Amusement, Social, Recreation Plan 09-89-1005 Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Canst: Size Unfinished/Basement ~ Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths ~ D Projection I Canopies 0 Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Required Flood Plain - # Dwelling Units 0 Height Permit # Structures Park Dedication ~ Use/Nature ofWork avem / Alterations to expand tavem into adjacent tenant space, remodel interior of both spaces for Tavem use. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valu~ Issued By: $80,000.00 Plan Approval $0.00 Permit Fee Paid $304.00 Park Dedication $0.00 Date 11/17/2005 Final/O.P. 00/00/0000 D PennitVoided I Parcelld # 0400880000 In the performance of this work I agree to perform all work pursuant to ruies governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this pennit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Date Address 5711 GREEN VALLEY RD Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number 231-8635 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.