Loading...
HomeMy WebLinkAbout0117329-Building (shower stall) e OSHKOSH ON THE WATER Job Address 223DALEAVE CITY OF OSH/<OSH BUILDING PERMIT - APPLICATION AND RECORD i No 117329 Category 140 -Interior Remodeling I Owner TRACY LUCHETTA Contractor CENTRAl STREET CARPENTRY ! Create Date 11/16/2005 Designer Plan Unfinished/Basement -----.2 Sq. Ft. -----.2 Sq. Ft. Rooms 0 I 0 Fence I ----C::ht I Stories I 0 Raze Type . Building 0 Sign 0 Canopy Zoning Class of Const: Size 0 Ft. 0 Projection I Finished/Living Bedrooms Canopies 0 Garage -----.2 Sq. Ft. Baths 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Oth~r Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature ofWork FRI Removing the existing shower stail in the second fioor bathroom and ihstaillng a new tile shower and fioor. I HVAC Contractor I Plumbing Contractor I UNKNOWN Electric Contractor Fees Vatuatlon $6.200.00 Plan Approval ISSU~d By: ;o¿~ $0.00 Permit Fee Paid $56.00 Park Dedication $0.00 Date 11/16/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0403800000 In the performance of this work I agree to perform ail work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and tos nyne a alsbefo tartingsuchactivity. i:" Signatur Date Agenl/Owner Address 1435 CENTRAL ST OSHKOSH WI 54901 - 0000 Telephone Number 4 6-5147 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.