HomeMy WebLinkAbout0117329-Building (shower stall)
e
OSHKOSH
ON THE WATER
Job Address 223DALEAVE
CITY OF OSH/<OSH
BUILDING PERMIT - APPLICATION AND RECORD
i
No
117329
Category
140 -Interior Remodeling
I
Owner TRACY LUCHETTA
Contractor CENTRAl STREET CARPENTRY
!
Create Date
11/16/2005
Designer
Plan
Unfinished/Basement
-----.2 Sq. Ft.
-----.2 Sq. Ft.
Rooms
0
I
0 Fence
I
----C::ht
I
Stories
I
0 Raze
Type
. Building
0 Sign
0 Canopy
Zoning
Class of Const:
Size
0 Ft.
0 Projection I
Finished/Living
Bedrooms
Canopies
0
Garage
-----.2 Sq. Ft.
Baths
0
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Oth~r
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
~
Use/Nature
ofWork
FRI Removing the existing shower stail in the second fioor bathroom and ihstaillng a new tile shower and fioor.
I
HVAC Contractor
I
Plumbing Contractor
I
UNKNOWN
Electric Contractor
Fees Vatuatlon $6.200.00 Plan Approval
ISSU~d By: ;o¿~
$0.00 Permit Fee Paid
$56.00 Park Dedication
$0.00
Date 11/16/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0403800000
In the performance of this work I agree to perform ail work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and tos nyne a alsbefo tartingsuchactivity. i:"
Signatur Date
Agenl/Owner
Address 1435 CENTRAL ST OSHKOSH WI 54901 - 0000 Telephone Number 4 6-5147
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.