Loading...
HomeMy WebLinkAbout0117279-Building (piers) e OSHKOSH ON THE WATER Job Address 2737 HARRISON ST CITY OF OSHKOSH No 117279 BUILDING PERMIT - APPLICATION AND RECORD OWner OSHKOSH TRUCK CORP Create Date 11/14/2005 Designer Contractor B P BAKER CONSTRUCTION INC Category 211 - Alteration Industrial Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~sq.Ft. Rooms ~ Height 0 Ft. Finished/Living ~sq.Ft. Bedrooms ~ Stories Garage ~sq.Ft. Baths 0 0 Projection I Canopies Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Use/Nature Factory/ Alterations to install 3 new piers for Shothlast Penthouse. Install a 22><95 irreg shape machinery foundation and pit for shot blast of Work process. # Dwelling Units ~ # Structures ~ Park Dedication HVAC Contractor Plumbing Contractor 5,000.00 Plan Approval $0.00 Permit Fee Paid $199.00 Park Dedication $0.00 Issued By: Date 11/14/2005 FinaIlO.P. 00/00/0000 0 Permit Voided I Parcelld # 1519500000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, If you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to y ne~ppr Is before starting such activity. / / Signature ÖCJ Date '¡//;r4j- AgenllOwner Address 5524 ZOAR RD PICKETT WI 54964 - 0000 Telephone Number 920-589-5750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.