Loading...
HomeMy WebLinkAbout0117267-Building e OSHKOSH ON THE WATER Job Address 1730 CRESTVIEW DR CITY OF OSHKOSH No 117267 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS AIJUDITH KOENING Create Date 11/14/2005 Designer Contractor PORTSIDE BUILDERS, INC. Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. 0 Projection I Finished/Living Bedrooms 0 Stories Canopies 0 Garage ~Sq.Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures -----.<J Use/Nature SFR/ Remodel kitchen. and replace flooring of Work Electric Contractor MCM AIR INC ZIMMER ELECTRIC INC Plumbing Contractor PLUFF PLUMBING HVAC Contractor Fees: Valuation $29,050.00 Plan Approval $0.00 Permit Fee Paid $154.00 Park Dedication $0.00 Issued By: Date 11/14/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld#1316110000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictons of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 980 AMERICAN DR AgenUOwner NEENAH WI 54956 - 0000 Telephone Number 920-727-4874 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is noi performed within two business days from the time the project is ready.