Loading...
HomeMy WebLinkAbout0117265-Building (patio door) e OSHKOSH ON THE WATER Job Address 1418 COOLIDGE AVE CITY OF OSHKOSH No 117265 BUILDING PERMIT - APPLICATION AND RECORD Owner LELAND R ZIEBELL Create Date Designer 11/14/2005 Contractor PORTSIDE BUILDERS, INC. Category 141 - Exterior Remodeling Plan Zoning . Building Type 0 Sign 0 Canopy 0 Fence 0 Raze Class of Canst: Size Unfinished/Basement --.!> Sq. Ft. --.!> Sq. Ft. Rooms 0 Height Bedrooms 0 Stories Baths 0 Ft. 0 Projection I Finished/Living Canopies 0 Garage --.!> Sq. Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units -----...tJ # Structures -----...tJ Use/Nature ofWork rFR/ Replace pation door. I HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,500.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 11/14/2005 Final/O.P.~ 0 Permit Voided I Parcel Id # 1603220000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity, Signature Date Address 980 AMERICAN DR Agent'Owner NEENAH WI 54956 - 0000 Telephone Number 920-727-4874 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e, Footing, Service, Final, etc,), Access into Building if Secure (how do we gain entry), your Name and Phone Number, Unless specified otherwise, we will assume the project is ready at the time the request is received, Work may continue if the inspection is not performed within two business days from the time the project is ready,