Loading...
HomeMy WebLinkAbout0117240-Plumbing (repair lateral) e OSHKOSH ON THE WATER Job Address 655 W SOUTH PARK AVE Contractor TOM JOHANN PLUMBING LLC CITY OF OSHKOSH No 117240 PLUMBING PERMIT - APPLICATION AND RECORD Owner MARY L PIERCE Create Date 11/10/2005 Category 401 - Residential-Exterior (laterals) ptan Coffee Maker 0 Int Grease Trap ~ Ex! Grease Trap ~ RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Bathtub 0 Shower 0 Water Softner 0 WaitSt 0 Shamp Sink 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink ~ Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin ~ Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn ~ Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain ~ Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp ~ Misc. 0 Fixtures Use/Nature ofWork Valuation Issued By Repair sanitary sewer lateral by inserting PVC replacement section (ck# 2139) Size Material Type # Conn. Type Sanitary Sewer 6" Vitrified Clay Lateral 1 Repair 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcelld # 0 1304570000 $500.00 $0.00 $50.00 0 Permit Voided I Permit Fees Plan Approval Date 11/10/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party. if you perform the work described In this permit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Address W1430 OLD BRIDGE RD Signature Date Agent/Owner CAMBLESPORT WI 53010 - 0000 Telephone Number 262-626-1605 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified othervvise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.