HomeMy WebLinkAbout2005-HVAC (furnace)
G
OSHKOSH
ON THE WATER
Job Address 311 ROSALIAST
CITY OF OSHKOSH
HVAC PERMIT - APPLICATION AND RECORD
No
117228
OWner
MARK J ROLEY
Create Date 11/10/2005
Plan
Contractor PREMIUM AIR INC
Fuel 1,(1 Gas
System n New
~ Forced Air
1 I Electric
Chimney Type K) Chimney A
Heat Loss K ) As Approved
BTU Rate K ) As Per Plan
Category 500 - Residential-Heating & Ventilating
1 I Solar
1 I Solid
I I Oil
I 1 Electric
R:J Replace
U Steam
1 1 Suppl.
U NC 1
I I Con. Burner 1
( ) Not Applicable
U Vent
n Other
U Radiant
I 1 Hot Water
() ChimneyB
. Existing
. DirectVent
( ) Not Applicable
. Other
Value
( ) Variable
Value 60000
Use/Nature ßFRI Repalce fumace, EIV provided by Premium Aire Inc, NO Chimney liner being installed --Where an appliance is penmanentiy
of Work isconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in the interior
f the CN and to provide the appliance or appliances served with the req. draft.
Fees: Valuation
Issued By:
$3,362.00
Plan Approval
$0.00
Permit Fee Paid
$56.00
Date 11/10/2005
Parcelld # 0204610000
0 Permit Voided I
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Telephone Number
920-982-3323
Address
N3225 HWY 15
Agent/Owner
HORTONVILLE
WI 54944-0
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.