Loading...
HomeMy WebLinkAbout2005-HVAC (furnace) G OSHKOSH ON THE WATER Job Address 311 ROSALIAST CITY OF OSHKOSH HVAC PERMIT - APPLICATION AND RECORD No 117228 OWner MARK J ROLEY Create Date 11/10/2005 Plan Contractor PREMIUM AIR INC Fuel 1,(1 Gas System n New ~ Forced Air 1 I Electric Chimney Type K) Chimney A Heat Loss K ) As Approved BTU Rate K ) As Per Plan Category 500 - Residential-Heating & Ventilating 1 I Solar 1 I Solid I I Oil I 1 Electric R:J Replace U Steam 1 1 Suppl. U NC 1 I I Con. Burner 1 ( ) Not Applicable U Vent n Other U Radiant I 1 Hot Water () ChimneyB . Existing . DirectVent ( ) Not Applicable . Other Value ( ) Variable Value 60000 Use/Nature ßFRI Repalce fumace, EIV provided by Premium Aire Inc, NO Chimney liner being installed --Where an appliance is penmanentiy of Work isconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in the interior f the CN and to provide the appliance or appliances served with the req. draft. Fees: Valuation Issued By: $3,362.00 Plan Approval $0.00 Permit Fee Paid $56.00 Date 11/10/2005 Parcelld # 0204610000 0 Permit Voided I In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Telephone Number 920-982-3323 Address N3225 HWY 15 Agent/Owner HORTONVILLE WI 54944-0 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.