Loading...
HomeMy WebLinkAbout0117219-HVAC (boiler) ~ OSHKOSH ON THE WATER Job Address 1310POWERSST CITY OF OSHKOSH No 117219 HVAC PERMIT - APPLICATION AND RECORD Owner DEXTER E COOK CUSTOM HEATING & COOLING Category 500 - Residential-Heating & Ventilating Create Date 11/10/2005 Plan Contractor Fuel 1,(1 Gas [l New U Forced Air I I Electric I 1 Oil I l I Solar l 1 Solid U Radiant 1,(1 HotWater I I Electric I?I Replace U Steam I 1 Suppl. n Other System Heat Loss U As Approved K ) As Per Plan ( ) Chimney B . Existing ( ) DirectVent U AlC 1 I I Con. Burner I . Not Applicable U Vent Chimney Type K) Chimney A BTU Rate ( ) Variable ( ) Not Applicable . Other Value Value Use/Nature FRI Replace boiler - EIV provided by Hoehne Elect, No chimney liner being installed -Where an appliance is permanently disconnected of Work rom an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in the interior of the CN and 0 provide the appliance or appliances served with the req. draft, Fees: Valuation $3,200.00 Plan Approval $0.00 Permit Fee Paid $53.00 Date 11/10/2005 Issued By: 0 Permit Voided I Parcelld # 1507650000 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity, Signature Date Agent/Owner Address 1503 SOUTH MAIN STREET OSHKOSH WI 54902-0 Telephone Number (920) 235-7263 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.