HomeMy WebLinkAbout0117219-HVAC (boiler)
~
OSHKOSH
ON THE WATER
Job Address 1310POWERSST
CITY OF OSHKOSH
No
117219
HVAC PERMIT - APPLICATION AND RECORD
Owner
DEXTER E COOK
CUSTOM HEATING & COOLING
Category 500 - Residential-Heating & Ventilating
Create Date 11/10/2005
Plan
Contractor
Fuel
1,(1 Gas
[l New
U Forced Air
I I Electric
I 1 Oil
I
l I Solar
l 1 Solid
U Radiant
1,(1 HotWater
I I Electric
I?I Replace
U Steam
I 1 Suppl.
n Other
System
Heat Loss
U As Approved
K ) As Per Plan
( ) Chimney B
. Existing
( ) DirectVent
U AlC 1
I I Con. Burner I
. Not Applicable
U Vent
Chimney Type K) Chimney A
BTU Rate
( ) Variable
( ) Not Applicable
. Other
Value
Value
Use/Nature FRI Replace boiler - EIV provided by Hoehne Elect, No chimney liner being installed -Where an appliance is permanently disconnected
of Work rom an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in the interior of the CN and
0 provide the appliance or appliances served with the req. draft,
Fees: Valuation
$3,200.00
Plan Approval
$0.00
Permit Fee Paid
$53.00
Date 11/10/2005
Issued By:
0 Permit Voided I
Parcelld # 1507650000
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity,
Signature
Date
Agent/Owner
Address
1503 SOUTH MAIN STREET
OSHKOSH
WI 54902-0
Telephone Number
(920) 235-7263
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.