Loading...
HomeMy WebLinkAbout0117217-Building (attic) e OSHKOSH ON THE WATER Job Address 234 CHURCH AVE CITY OF OSHKOSH No 117217 BUILDING PERMIT - APPLICATION AND RECORD Owner WINN CTY HISTORICAL & ARCH SOCIETY Create Date 11/09/2005 Designer Contractor A SQUARE BUILDERS LLC Category 141 - Exterior Remodelin9 Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze ~ Zoning Class of Const: Size Unfinished/Basement -----2 Sq. Ft. Rooms Finished/Living -----2 Sq. Ft. Bedrooms Garage -----2 Sq. Ft. Baths Height Oft. 0 Projection I Stories Canopies 0 Signs -----2 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain - # Dwelling Units 0 Height Permit Park Dedication # Structures 0 Use/Nature Multi-Family -Instali a 8x10 fumace room in the attic. ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuatiî~ Issued By: ~ J~l.:: $1.200.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 11/10/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0703390000 In the performance of this work I agree to perform ali work pursuant to rules governing the described construction. While the City of kosh has thority to enforce easement restrictions of which it is not a party. if you perform the work described in thIS.{;' it app cation ithin easement. the City strongly urges the permit applicant to contact the easement holder(s) and! cure an necess ry vais before starting such activity. ~. . Signatur -:::::::.. Date Ib D Agent/Owner Address 8878 COUNTY RD D WINNECONNE WI 54986 - 0000 Telephone Number 716-4450 To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.