HomeMy WebLinkAbout0117249-Building (repair foundation)
e
OSHKOSH
ON THE WATER
Job Address 689W9THAVE
CITY OF OSHKOSH
No
117249
BUILDING PERMIT - APPLICATION AND RECORD
OWner LEE J TRITT
Create Date
11/10/2005
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fenee
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq,Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0 --
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature
of Work
FR/ Repairing the SE corner of foundation 5' x12' with new footing and block and pouring a fioor in that area.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$2,000.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Issued By:
w
Date 11/10/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Pareelld # 1305720000
In the perfonnanee of this work I agree to perform all work pursuant to rules governing the described construction,
While the City of Oshkosh has no authority to enforee easement restrictions of which it is not a party, if you perform the work
described in this pennit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure an~ app~rovals before starting such activity.) I ~
Signature X. ~ .--L- -~ Date-,\:" f ¿)J:::.lø
AgenUOwner
Address 270 SUNNYBROOK DR
OSHKOSH
WI 54904 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.