Loading...
HomeMy WebLinkAbout0117249-Building (repair foundation) e OSHKOSH ON THE WATER Job Address 689W9THAVE CITY OF OSHKOSH No 117249 BUILDING PERMIT - APPLICATION AND RECORD OWner LEE J TRITT Create Date 11/10/2005 Designer Contractor OWNER Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fenee 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq,Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 -- 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature of Work FR/ Repairing the SE corner of foundation 5' x12' with new footing and block and pouring a fioor in that area. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,000.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By: w Date 11/10/2005 Final/O.P. 00/00/0000 0 Permit Voided I Pareelld # 1305720000 In the perfonnanee of this work I agree to perform all work pursuant to rules governing the described construction, While the City of Oshkosh has no authority to enforee easement restrictions of which it is not a party, if you perform the work described in this pennit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure an~ app~rovals before starting such activity.) I ~ Signature X. ~ .--L- -~ Date-,\:" f ¿)J:::.lø AgenUOwner Address 270 SUNNYBROOK DR OSHKOSH WI 54904 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.