HomeMy WebLinkAbout0117246-Plumbing (tub/lav)
~
OSHKOSH
ON THE WATER
Job Address 253 W 6TH AVE
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
117246
Owner KNOLL STANLEY R
Create Date 11/10/2005
Category 410 - Residential-Interior
Plan
Contractor J RASMUSSEN PLUMBING INC
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
ofWork
Valuation
Issued By
1
0
1
0
0
0
0
0
0
0
Shower 0 Water Softner 0 Wail.SI. 0 Shamp Sink 0 Coffee Maker 0
Floor Drain 0 Local Waste 0 Ice Chest 0 Flr/Wst Sink 0 Int Grease Trap 0
Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZValve 0
Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 WtrSewerMtrs 0
Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Breakrm Sink 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
r"-~-w",~" "~,-
Size
Material
Type
Sanitary Sewer
#
0
0
0
0
0
Conn. Type
Storm Sewer
Water Service
Parcelld #
0900040000
$1,500.00
$0.00
$20.00 0 Permit Voided I
Plan Approval
Permit Fees
Date 11/10/2005
In the performance of this work. I a9ree to perform aU work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the
easement hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Address
Date
Agent/Owner
1914 GREENBRIAR TRL
OSHKOSH
920-233-6747
WI 54904 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.