Loading...
HomeMy WebLinkAbout0117215-Building (overhead door) 0 OSHKOSH ON THE WATER Job Address 708 NICOLET AVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 117215 OWner BOBBY FREID Create Date 11/09/2005 Designer Contractor DAN V BINDER CONSTRUCTION Category 211 - Alteration Industrial Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----.JJ. Sq. Ft. Rooms Finished/Living ----.JJ. Sq. Ft. Bedrooms Garage ----.JJ. Sq. Ft. Baths Height 0 Ft. D Projection I Stories Canopies Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units ~ # Structures ~ Park Dedication UselNature Contractor Shop/ Abandon one Overhead Door opening, install infill panel with 3'0" exit door. ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valua $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 11/09/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1520910000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a parfy. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to seçure any n:cessa~ovals befor starting such activity. Signature Agent/Owner Date //-¡?-c2r Address 1224 W SOUTH PARK AVE OSHKOSH WI 54902 - 0000 Telephone Number 231-2114 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.