HomeMy WebLinkAbout2005-Building
.0,
OSHKOSH
ON THE WATER
Job Address 440 WYLDEWOOD DR
CITY OF OSHKOSH
No
117187
BUILDING PERMIT - APPLICATION AND RECORD
OWner MARY SCOFIELD
Create Date
11/07/2005
Designer
Contractor
OWNER
Category
140 -Interior Remodeiing
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
D Projection I
Canopies
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units ~
# Structures
0
Park Dedication
Use/Nature CONDO/ Constructing a bathroom in the basement. All construction shall meet minimum code requirements. NOTE: Watters Plumbing
of Work is doing the work. (ready to issue. nk)
HVAC Contractor
Plumbing Contractor
WATTERS PLUMBING
Electric Contractor
CUMiNGS ELECTRIC INC
$3.500.00 Plan Approval
$0.00 Permit Fee Paid
Fees: Valuation
Issued By: ~
$38.00 Park Dedication
$0.00
Date 11/07/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld #
in the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restnctions of which it is not a party. if you perform the work
described in this permit appiication within an easement, the City strongiy urges the permit appiicant to contact the easement
holder(s) and to secure any necessary pprovals ~.efore starting such activity.
JJ
(/ AgenUOwner
Address t./4ù VvI1IJ~ U1~~J 01"; V-Q Oshkosh
J
WI 54901 - 0000
Telephone Number ~'O-
Signature
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
~ 001/003
111/0712005 ION 10:02 FAll 920 733 2713 WATIJIRS PI.UiBING
Fax
'N~m~¡¡..Qg
"<'\'¡P'
To:
Nicole (ph: 920-236-5036)
F..om:
Erika
Fax: 920-236-5084
Date: 11/07/05
Pages (w/cove..):, 3
Ou.. Phone:
920-733-8125
920-733-2713
Re:
Building permit
Ou.. Fax:
0 Urgent
0 For Review ß( Please Comment
0 Please Recycle
0 Please Reply
<?' Comments
Hi Nicole!
Here is ëJ rough drawing of the bëJsement bathroom we intend to construct at:
440 Wyldewooc Dr.
Carpentry by: Watters Plumbing- Remodel Dept. (contact: Erika)
Plumbing by: Watters Plumbing- Commercial Dept (contact: Jamie Rameker)
Electrical by:
Cummings Electric- (contact: Dick)
As you and I discussed- this is the most current drawing to date- and we will construct accordingly:
the linen tower is going to be custom built.
This pian inciudes:
Ceiling height of: 8'
One entrance door of: 2'8"
Schedule:
Rough framing
Rough plumbing & Electrical
Thur 11/10 & Fli 11/11
Mon 11/14
NEED: ROUGH PLUMBING, ELECTRICAL AND BUILDING INSPECTION
Finish carpentry, Electrical and Plumbing- Tentative complete date: 11/18/05