HomeMy WebLinkAbout0117152 B
e
OSHKOSH
ON THE WATER
Job Address 215 OTTER AVE
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
117152
OWner HEFFERNON REV TRUST LIFE ESTATE
Create Date
11/07/2005
Designer
Contractor
LETT SIDING & TRIM
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
0
Height
0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
~ Sq. Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Penmit Not Required
Parik Dedication
# Dwelling Units ---'1
# Structures
0
Use/Nature
of Work
FR/lnstall vinyl siding on house, install replacement windows, and cover soffit and fascia
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$12,500.00 Plan Approval
$0.00 Permit Fee Paid
$89.00 Park Dedication
$0.00
Issued By:
Date 11/07/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0800400000
In the perfonmance of this work I agree to perform all work pursuant to nules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 5737 CLEVEDON LN
AgenUOwner
OSHKOSH
WI 54904 - 0000
Telephone Number
920-233-4144
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.