Loading...
HomeMy WebLinkAbout0117184-Building (windows; siding) e OSHKOSH ON THE WATER Job Address 222 N MEADOW ST CITY OF OSHKOSH No 117184 BUILDING PERMIT -APPLICATION AND RECORD Owner ROSINA E WENHARDT Create Date 11/07/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies 0 Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Bloèk 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature SFRI Replace all windows, remove existing siding. install 1/2" foam Insul. and vinyl siding. ofWork HVAC Contractor Plumbing Contractor Electric Contractor ::::d :::uation c¡fl 510,000.00 Plan Approval I $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Date 11/07/2005 Final/D,P. 00/00/0000 0 Permit Voided I Parcelld # 0609290000 In the performance of this work i agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvais before starting such activity. Signature Date Address 222 N MEADOW ST AgenUOwner OSHKOSH Wi 54902 - 4242 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.