Loading...
HomeMy WebLinkAbout2005-Building (2nd flr apts) e OSHKOSH ON THE WATER Job Address 448 N MAIN ST CITY OF OSHKOSH No 117188 BUILDING PERMIT - APPLICATION AND RECORD Owner JAHNKE 448 MAIN LLC Create Date 11/07/2005 Designer Contractor OWNER Category 130 - New Multi-Family Plan R2-101-1105 Type . Building 0 Sign Q Canopy 0 Fenee 0 Raze Zoning Class of Const: 3B Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. 0 Projection I Canopies 0 Finished/Living Bedrooms Stories 2 Garage ~Sq.Ft. Baths 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Park Dedication Not Required Flood Plain ~ # Dwelling Units 4 Height Permit Not Required # Structures Use/Nature ofWork ommerciai & Residentiai/ Comm/ Construct (4) four apartments on 2nd floor as per plans, and 1st floor retail. HVAC Contractor ~I~ctric Contractor WESLEY HEATING & COOLING INC Plumbing Contractor SECKAR ELECTRIC CO INC $146,300.00 Plan Approval $0.00 Permit Fee Paid $505.00 Park Dedication $0.00 Fees: Valuation Issued By: ~ Date 11/07/2005 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 0400960000 In the perfonmanee of this work I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement hOlder(S)~cure any nece~Iefore starting such activity. /¡ !õ Signature ~~7ft . Date I ~ ì or AgenUOwner Address L Oshkosh WI 54901 - 0000 Telephone Number 'lZtJ-3ð7-/:J&1' To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.