HomeMy WebLinkAbout0117182-Building
e
OSHKOSH
ON THE WATER
Job Address 2490 KINGSTON PL
CITY OF OSHKOSH
No
117182
BUILDING PERMIT - APPLICATION AND RECORD
Owner JAMES AIKATHY J BAULDRY
Create Date
11/07/2005
Designer
Contractor
JIM BAUER CARPENTRY AND CONSTRUCTIO
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms 0 Height 0 Fi.
Bedrooms Stories
Baths 0
0 Projection I
Finished/Living
Canopies
Garage
~Sq.Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature SFRI Remodeling the bathroom to include drywall repair, new vanity and flooring.
of Work
HVAC Contractor
Plumbing Contractor
SAMMONS PLUMBING
Electric Contractor
SLIM'S ELECTRIC INC
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 11/07/2005
Final/O.P. 00/00/0000
0 PenmltVolded I
Parcelld # 1312230000
in the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. If you perform the work
described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to securnnecessa: a als; re starting such activity.
Signature . ~ a
Date ~Jr' 7' o~
Address 6825 FRONTléR RD
WINNECONNE
WI 54986 - 0000 Telephone Number
920-582-7740
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.