HomeMy WebLinkAbout0117160-Building (windows)
G
OSHKOSH
ON THE WATER
Job Address 702 E IRVING AVE
CITY OF OSHKOSH
No
117160
BUILDING PERMIT - APPLICATION AND RECORD
Owner HARRY E/P D KIECKHAFER
Create Date
11/03/2005
Designer
Contractor
DAN V BINDER CONSTRUCTION
Category
141 - Exterior Remodeling
Plan
Typè
. Building
0 Sign
0 Canopy
Q Fence
0 Raze
Zoning
Class 01 Const:
Size
Unfinished/Basement
---.2 Sq. Ft.
---.2 Sq. Ft.
Rooms
Height
0 Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
---.2 Sq. Ft.
Baths
0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units ~
# Structures
~
Park Dedication
Use/Nature
olWork
FRI LATE PERMIT - 7 Windows being replaced.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,500.00 Plan Approval
~
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Issued By:
Date 11/07/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1106800000
In the performance 01 this work I agree to perform all work pursuant to rules governing the described construction.
While the City 01 Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approv Is belor tarting such activity.
,-
)<-
Date -<" //-?- 06
Signature
Address 1224 W SOUTH PARK AVE
Agent/Owner
OSHKOSH
WI 54902 - 0000 Telephone Number
231-2114
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type 01
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.