Loading...
HomeMy WebLinkAbout0117157-Building (roof) e OSHKOSH ON THE WATER Job Address 509 W 16TH AVE CITY OF OSHKOSH No 117157 BUILDING PERMIT - APPLICATION AND RECORD Owner 509 WEST 16TH AVENUE LLC Create Date 11/07/2005 Designer Contractor HICKEY ROOFING Category 141 - Exterior Remodelln9 Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. 0 Projection I Canopies 0 Finished/Living Bedrooms 0 Stories Garage ~ Sq. Ft. Baths 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures ~ Use/Nature ofWork FRI Tear.<>ff roofing, install new shingles on house only Plumbing Contractor HVAC Contractor Electric Contractor $3.900.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 11/07/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1301460100 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1427 BROAD ST Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number 4264008 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.