Loading...
HomeMy WebLinkAbout0117181-Building (landing; stairs) e OSHKOSH ON THE WATER Job Address 649 W 9TH AVE CITY OF OSHKOSH No 117181 BUILDING PERMIT - APPLICATION AND RECORD Owner CHASE MANHATTAN MORTGAGE CORP Create Date 11/07/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy Class of Canst: 0 Fence 0 Raze Zoning Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit # Dwelling Units 0 # Structures ~ Park Dedication Use/Nature SFRI Instaiied a patio door and wiii construct a code compliant landing and stairs to serve that door. Lighting shaii be existing or of Work provided for the exit. Plumbing Contractor HVAC Contractor Electric Contractor Fees: Valuation $750.00 ~ Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 11/07/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1303610000 In the performance of this work I agree to perfonn aii work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perfonn the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to see e any necessary provers before starting such activity. Signature ><.. Date .>«- Address 3415VISIONDR AgenUOWner COLUMBUS OH 43219 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.