HomeMy WebLinkAbout0117181-Building (landing; stairs)
e
OSHKOSH
ON THE WATER
Job Address 649 W 9TH AVE
CITY OF OSHKOSH
No
117181
BUILDING PERMIT - APPLICATION AND RECORD
Owner CHASE MANHATTAN MORTGAGE CORP
Create Date
11/07/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Canst:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms Stories
Garage ~Sq.Ft. Baths 0
0 Projection I
Canopies 0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units 0
# Structures
~
Park Dedication
Use/Nature SFRI Instaiied a patio door and wiii construct a code compliant landing and stairs to serve that door. Lighting shaii be existing or
of Work provided for the exit.
Plumbing Contractor
HVAC Contractor
Electric Contractor
Fees: Valuation
$750.00
~
Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
Date 11/07/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1303610000
In the performance of this work I agree to perfonn aii work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perfonn the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
hoider(s) and to see e any necessary provers before starting such activity.
Signature
><..
Date
.>«-
Address 3415VISIONDR
AgenUOWner
COLUMBUS
OH 43219 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.