Loading...
HomeMy WebLinkAbout0117183-Building (window) e OSHKOSH ON THE WATER Job Address 1717W7THAVE CITY OF OSHKOSH No 117183 BUILDING PERMIT - APPLICATION AND RECORD Owner STEVENNICTORIA UTECHT Create Date 11/07/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~ Sq. Ft. Rooms Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies ~ Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFRIReplace bay window. NO STRUCTURAL CHANGES. Permit issued to Amanda Seegers, daughter of owners. of Work HVAC Contractor Plumbing Contractor Electric Contractor $1,700.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 11/07/2005 Final/O.P. 00/00/0000 0 Penmit Voided I Parcelld # 0613040000 In the perfonmance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature (/A"ßt/J7~r/hJ{l?fJ AgenUOwner Address 1717 W 7TH AVE OSHKOSH Date ¡I-I) 1-f)5 WI 54902 - 5510 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, We will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.