HomeMy WebLinkAboutErosion Control - 03/17/2004
CITY OF OSHKOSH EROSION CONTROL
OFFICIAL VIOLATION NOTICE
PROJECT
ADDRESS 3665 S\-.orIL'o'Td
CONTRACTOR MAILING ADDRESSIFAX #
DATE!
TIME
VIOLATION
NOTED
VIOLATIONS
~\ \ì \()4,
X. COMM 21.125(IXa)
EROSION CONTROL
PERIMETER MEASURES
c.-\:.
LJ¡.,\.., \iOrY\ECS
CONTRACTOR
12.5
8"Z5
CORRECTION'REQUIRED
DATE/TIME
COMPLIANCE
REQUIRED
INSTALL
- MAlNT A1N
---X.. OTHER &\"..".1 E!1\ds up
cJfve'" 5ícJes\~ '" short J¡sk{<1..
3\Z,?>\O,,\
-ro/j AM
COMM 21.125(3)(a) TRENCHED IN AT LEAST 4"
SILT FENCE NOT INSTALLED - BACKFILLED & COMPACTED
PROPERLY = STAKES WRONG SIDE
3\11 \0"1
-.L COMM 21.125(1)(c)
ROCKJGRA VEL TRACKING
PAD 2"-3" stone, miIrimum6"
base (NOTE: '¡'" stone is NOT
adequate!)
- COMM 21.125(1)(d)
SEDIMENT CLEAN-UP
--2L INSTALL
~ MAlNT A1N
3)23>10"1
7:iX) AM
- STREET/CURB & GUTTER CLEAN-UP
_SIDEWALK(S)
- ADJOlNlNG PROPERTY
ACTION:
Please correct the above violations within the time frames noted. Failure to contact this office to verify compliance prior
to the deadline will result in citations issued for each violation noted above.
THIS NOTICE'IS REQUIRED TO BE SIGNED, DATED, AND MAILED OR FAXED TO OUR OFFICE WHEN
THE CORRECTIONS HAVE BEEN MADE.
Fax # 920-236-5084 Mailing Address: City of Oshkosh P.O. Box 1130 Oshkosh, WI 54903-1130
Per COMM 21.125 Erosion control measures are required to be installed within 24 hours of beginning excavation,
It is the responsibility of the contractor to regularly inspect and maintain any required erosion control measures.
Sediment tracked on to the street shall be cleaned up by the end of that day.
I hereb certi that the violations at the above address have been corrected.
.;CONTRACTOR SIGNATURE
FOR OFFICE USE ONLY;
NOTICE MAILEDIFAXED
¡Ç 'XED
8'.!:£",^,/\ 11)",1"",/
DATEITIME
8:2, 3//8/01
INSPECTOR
)~