Loading...
HomeMy WebLinkAboutErosion Control - 03/17/2004 CITY OF OSHKOSH EROSION CONTROL OFFICIAL VIOLATION NOTICE PROJECT ADDRESS 3665 S\-.orIL'o'Td CONTRACTOR MAILING ADDRESSIFAX # DATE! TIME VIOLATION NOTED VIOLATIONS ~\ \ì \()4, X. COMM 21.125(IXa) EROSION CONTROL PERIMETER MEASURES c.-\:. LJ¡.,\.., \iOrY\ECS CONTRACTOR 12.5 8"Z5 CORRECTION'REQUIRED DATE/TIME COMPLIANCE REQUIRED INSTALL - MAlNT A1N ---X.. OTHER &\"..".1 E!1\ds up cJfve'" 5ícJes\~ '" short J¡sk{<1.. 3\Z,?>\O,,\ -ro/j AM COMM 21.125(3)(a) TRENCHED IN AT LEAST 4" SILT FENCE NOT INSTALLED - BACKFILLED & COMPACTED PROPERLY = STAKES WRONG SIDE 3\11 \0"1 -.L COMM 21.125(1)(c) ROCKJGRA VEL TRACKING PAD 2"-3" stone, miIrimum6" base (NOTE: '¡'" stone is NOT adequate!) - COMM 21.125(1)(d) SEDIMENT CLEAN-UP --2L INSTALL ~ MAlNT A1N 3)23>10"1 7:iX) AM - STREET/CURB & GUTTER CLEAN-UP _SIDEWALK(S) - ADJOlNlNG PROPERTY ACTION: Please correct the above violations within the time frames noted. Failure to contact this office to verify compliance prior to the deadline will result in citations issued for each violation noted above. THIS NOTICE'IS REQUIRED TO BE SIGNED, DATED, AND MAILED OR FAXED TO OUR OFFICE WHEN THE CORRECTIONS HAVE BEEN MADE. Fax # 920-236-5084 Mailing Address: City of Oshkosh P.O. Box 1130 Oshkosh, WI 54903-1130 Per COMM 21.125 Erosion control measures are required to be installed within 24 hours of beginning excavation, It is the responsibility of the contractor to regularly inspect and maintain any required erosion control measures. Sediment tracked on to the street shall be cleaned up by the end of that day. I hereb certi that the violations at the above address have been corrected. .;CONTRACTOR SIGNATURE FOR OFFICE USE ONLY; NOTICE MAILEDIFAXED ¡Ç 'XED 8'.!:£",^,/\ 11)",1"",/ DATEITIME 8:2, 3//8/01 INSPECTOR )~