Loading...
HomeMy WebLinkAbout0117126-Building (siding & windows) e OSHKOSH ON THE WATER Job Address 2923 SHADOW LN CITY OF OSHKOSH No 117126 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS D BREY Create Date 11/04/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies 0 Garage ~Sq.Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures -----------.!! Use/Nature afWork fr / install siding on house & garage, replacing wood with vinyl, electric not applicabl...j biacks previously Installed also replacing 10 Indaws, same size same location, no structural changes HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,000.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: Date 11/04/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1519625200 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement halder(s) and to secure/ny necessary approvals before starting such activity. l ) Signature -/L.¿r -ß¡, Date IL 4/75' Agent/Owner Address 2923 SHADOW LN OSHKOSH WI 54901 - 1423 Telephone Number 414-231-5164 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.