Loading...
HomeMy WebLinkAbout0117141-Plumbing (sump pump) G OSHKOSH ON THE WATER Job Address 757 BOWEN ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner JAN C/BARBARA L MORRICAL Contractor SAMMONS PLUMBING Category 420 - Residential-Other Bathtub 0 Shower 0 Water Softner 0 Wait St. 0 Shamp Sink 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Bar Sink 0 Sump Pump 1 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures No 117141 Create Date 11/04/2005 Plan Coffee Maker 0 Int Grease Trap ------2 Ext Grease Trap ------2 RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Use/Nature ofWork r'M"~' _,,"m, Size Material .. # Conn. Type Type Sanitary Sewer 0 0 0 0 0 Storm Sewer Water Service 0 0 0 0 0 $20.00 0 Permit Voided I Valuation $400.00 $0.00 Permit Fees Plan Approval Issued By Date 11/04/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a parfy. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 522 W. MURDOCK AVE AgenUOwner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 Parcelld # 1107130000 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.