Loading...
HomeMy WebLinkAbout0117107-Building (roof) e OSHKOSH ON THE WATER Job Address 1007 WAUGOO AVE CITY OF OSHKOSH No 117107 BUILDING PERMIT - APPLICATION AND RECORD Owner MICHAEL KICONNI DAY Create Date 11/03/2005 Designer Contractor KLEIN'S HOME IMPROVEMENT Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -------9. Sq, Ft. -------9. Sq, Ft. Rooms Height 0 Ft. D Projection I Finished/Living Bedrooms 0 Stories Canopies Signs Garage -------9. Sq. Ft. Baths Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units ----------'J. # Structures ----------'J. Park Dedication Use/Nature HES/ Reroof house, tear off existing, install new shingles. ofWork HVAC Contractor Plumbing Contractor Electric Contractor $0.00 Permit Fee Paid $50.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 11/03/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0204030000 In the performance of this work I agree to perform all work pursuant to rules governing the described ccnstruction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this per' it a llcation within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to ~~c r a ary approvals before starting such activity. Signature Date Address 972 E SUNNYVIEW RD LOT 9 AgenVOwner OSHKOSH ~ 54901 - 0000 Telephone Number (920) 231-5301 HOM To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.