Loading...
HomeMy WebLinkAbout0117110-Plumbing (water heater) G OSHKOSH ON THE WATER Job Address 1520 MARQUETTE AVE CITY OF OSHKOSH No 117110 PLUMBING PERMIT - APPLICATION AND RECORD Contractor OWNER Category 411 - Residential-Water Heaters Create Date 11/03/2005 Plan OWner TODD C/BARBARA CLARK Bathtub 0 Shower 0 Water Softner 0 Wait.St. 0 Shamp Sink 0 Coffee Maker 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 Flr/WstSink 0 Int Grease Trap 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZValve 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 WtrSewerMtrs 0 Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 Site Drain 0 Breakrm Sink 0 DipWeli 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature ofWork r'~"~' ~ ~ø "-, Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 0 Permit Voided I Parcelld # 1227140000 Sanitary Sewer Storm Sewer Water Service Valuation $550.00 Plan Approval $0.00 Permit Fees Issued By Date 11/03/2005 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in . pe it application within an easement, the City strongly urges the permit applicant to contact the older(s) cu e a sa pprovals before starting such activity. Date 11/3 j¿:>'5 , , Agent/Owner OSHKOSH ~ 54901 - 0704 Telephone Number Address 1520 MARQUETTE AVE To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.