HomeMy WebLinkAbout0117110-Plumbing (water heater)
G
OSHKOSH
ON THE WATER
Job Address 1520 MARQUETTE AVE
CITY OF OSHKOSH
No
117110
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor OWNER
Category 411 - Residential-Water Heaters
Create Date 11/03/2005
Plan
OWner TODD C/BARBARA CLARK
Bathtub 0 Shower 0 Water Softner 0 Wait.St. 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 Flr/WstSink 0 Int Grease Trap 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZValve 0
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 WtrSewerMtrs 0
Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Site Drain 0 Breakrm Sink 0 DipWeli 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature
ofWork
r'~"~' ~ ~ø "-,
Size
Material
Type # Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 0 Permit Voided I
Parcelld #
1227140000
Sanitary Sewer
Storm Sewer
Water Service
Valuation
$550.00
Plan Approval
$0.00
Permit Fees
Issued By
Date 11/03/2005
In the performance of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in . pe it application within an easement, the City strongly urges the permit applicant to contact the
older(s) cu e a sa pprovals before starting such activity.
Date 11/3 j¿:>'5
, ,
Agent/Owner
OSHKOSH
~ 54901 - 0704 Telephone Number
Address 1520 MARQUETTE AVE
To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.