Loading...
HomeMy WebLinkAbout2005-Plumbing (sink) e OSHKOSH ON THE WATER Job Address 432434 N MAIN ST CITY OF OSHKOSH No 117112 PLUMBING PERMIT -APPLICATION AND RECORD Owner TOO MAR PROPERTY MANAGEMENT Create Date 11/03/2005 Contractor M P KELLY Category 440 - Industrial-Interior Plan Bathtub 0 Shower 0 Whirlpool 0 Floor Drain 0 Lavatory 0 Lndry Tray 0 Toilet 4 Disposal 0 Res. Sink 0 Dishwasher 0 Bar Sink 1 Sump Pump 0 Water Heater 0 Classrm Sink 0 Site Drain 0 Breakrm Sink 0 Roof Drain 0 Ejector/Grind 0 Misc. 0 Fixtures Water Softner 0 Wait St. 0 Shamp Sink 0 Coffee Maker 0 Local Waste 0 lee Chest 0 FlrlWst Sink 0 Int Grease Trap 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve ---.2 Beer Tap 0 Hand Sink 0 Urinal 1 Eye Wash Statn 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Sterilizer 0 Surgeons Sink 0 lee Maker 1 Deduct Meters 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Use/Nature of Work l'~'~'" Size Material Type # 0 0 0 0 0 0 0 0 0 0 Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0400880000 Valuation $9,000.00 Plan Approval $0.00 Permit Fees $49.00 D Pennit Voided I Issued By Date 11/03/2005 In the perfonnanee of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, If you perfonn the work described in this pennil application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST AgenUOwner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.