HomeMy WebLinkAbout0117101-Plumbing
G
OSHKOSH
ON THE WATER
Job Address 1300 S KOELLER ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
117101
Owner SHOPKO STORES INC
Create Date 08/18/2005
Plan
Contractor M P KELLY
Category 440 - Industrial-Interior
Bathtub 0 Shower 0 Water Softner 0 Wait.S!. 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 Floor Drain ---2 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 3 Disposal ---2 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Res. Sink 0 Dishwasher ---2 Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink 0 Sump Pump ---2 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater 0 Classrm Sink ---2 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 1 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature
of Work
r~"
Type
#
0
0
0
0
0
Size
Material
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1308500100
$1,143.00
Plan Approval
$0.00
Permit Fees
$28.00 0 Permit Voided I
Valuation
Issued By
Date 11/02/2005
In the performance of this work, I agree to perfonn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penni! application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 665 N MAIN ST
Agent/Owner
OSHKOSH
WI 54901 - 4431
Telephone Number 231-1750
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i,e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.