HomeMy WebLinkAbout0117068 B
0
OSHKOSH
ON THE WATER
Job Address 731 VINE AVE
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
117068
Owner JAMES P TAUGHER
Create Date
11/01/2005
Contractor
IMPRESSIVE ROOFING AND SIDING INC
Designer
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height
0 Ft.
0 Projection I
Finished/Living
Bedrooms 0
Stories
Canopies ~
Garage
~ Sq. Ft.
Baths
0
Signs
~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
II Dwelling Units 0
II Structures
0
Use/Nature SFRI Tear-off roofing. install new roofing on house and garage - NO STRUCTURAL WORK
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$6,206.45 Plan Approval
$0.00 Permit Fee Paid
$56.00 Park Dedication
$0.00
Issued By:
Date 11/01/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld II 0503500000
in the performance of this work I agree to perfonm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 2786
AgenVOwner
APPLETON
WI 54912 - 2786
Telephone Number
232-1669
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.