Loading...
HomeMy WebLinkAbout0117056-HVAC (furnace) e OSHKOSH ON THE WATER Job Address 1017 N SAWYER ST CITY OF OSHKOSH No 117056 HVAC PERMIT - APPLICATION AND RECORD Owner KENNETH/GLORIA KUIK Create Date 11/01/2005 Plan Contractor PREMIUM AIR INC I"'¡ Gas Category 500 - Residential-Heating & Ventilating I I Solid I I Electric [1õI Replace U Steam I I Solar System n New ~ Forced Air I I Electric I I Oil I n Other Fuel Chimney Type K) Chimney A U Radiant I I HotWater ( ) Chimney B U AlC I I I Con. Burner I ( ) Not Applicable U Vent I I Suppl. . Direct Vent Heat Loss ( ) Existing ( ) Variable . Not Applicable . Other Value BTU Rate K ) As Approved K) As Per Plan Value 60000 Use/Nature FRI Replace fumace - EIV provided by Premium Air - No chimney liner being instaliedWhere an appliance is penmanently disconnected of Work rom an existing chimney or vent (CN), the CN shali be resized as necessary to control flue gas condensation in the interior of the CN and 0 provide the appliance or appliances served with the req. draft Fees: Valuation $4,807.00 Plan Approval $0.00 Permit Fee Paid $78.50 Issued By: Date 11/01/2005 0 Permit Voided I Parcelld # 1601670000 In tI1e pelformance of tI1is work, I agree to pelfonm ali work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you pelform the work described in this permit application within an easement, tI1e City strongly urges the penmit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Date AgenVOwner Address N3225 HWY 15 HORTONViLLE WI 54944-0 Telephone Number 920-982-3323 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.