HomeMy WebLinkAbout0117056-HVAC (furnace)
e
OSHKOSH
ON THE WATER
Job Address 1017 N SAWYER ST
CITY OF OSHKOSH
No
117056
HVAC PERMIT - APPLICATION AND RECORD
Owner
KENNETH/GLORIA KUIK
Create Date 11/01/2005
Plan
Contractor
PREMIUM AIR INC
I"'¡ Gas
Category 500 - Residential-Heating & Ventilating
I I Solid
I I Electric
[1õI Replace
U Steam
I I Solar
System
n New
~ Forced Air
I I Electric
I I Oil
I
n Other
Fuel
Chimney Type K) Chimney A
U Radiant
I I HotWater
( ) Chimney B
U AlC I
I I Con. Burner I
( ) Not Applicable
U Vent
I I Suppl.
. Direct Vent
Heat Loss
( ) Existing
( ) Variable
. Not Applicable
. Other
Value
BTU Rate
K ) As Approved
K) As Per Plan
Value 60000
Use/Nature FRI Replace fumace - EIV provided by Premium Air - No chimney liner being instaliedWhere an appliance is penmanently disconnected
of Work rom an existing chimney or vent (CN), the CN shali be resized as necessary to control flue gas condensation in the interior of the CN and
0 provide the appliance or appliances served with the req. draft
Fees: Valuation
$4,807.00
Plan Approval
$0.00
Permit Fee Paid
$78.50
Issued By:
Date 11/01/2005
0 Permit Voided I
Parcelld # 1601670000
In tI1e pelformance of tI1is work, I agree to pelfonm ali work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you pelform the work
described in this permit application within an easement, tI1e City strongly urges the penmit applicant to contact the easement
hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Date
AgenVOwner
Address
N3225 HWY 15
HORTONViLLE
WI 54944-0
Telephone Number
920-982-3323
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.