HomeMy WebLinkAbout0117091-Plumbing (sewer lateral)
e
OSHKOSH
ON THE WATER
Job Address 1803 MOUNT VERNON ST
CITY OF OSHKOSH
No
117091
PLUMBING PERMIT. APPLICATION AND RECORD
Owner MICHAEL J ARPS
Create Date 10/31/2005
Contractor SAMMONS PLUMBING
Category 401 - Residential-Exterior (laterals)
Plan
Bathtub 0 Shower 0 Water softner 0 Wai\.s\. 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 0 Disposal 0 Bidet 0 sculry Sink 0 Wash Ftn 0 RPZValve 0
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature
of Work
Relay building sanitary sewer from house to terrace. Slip line existing Clay (Debit Account)
Size Material Type # Conn. Type
Sanitary Sewer 4" Plastic Lateral 1 Relay
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcelld #
0 1503610000
Valuation
$600.00
Plan Approval
$0.00
Permit Fees
$50.00 0 Permit Voided I
Issued By
Date 11/01/2005
In the performance of tI1is work, I agree to perfonn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, If you perfonn the work
described in this permit application witl1in an easement, the City strongly urges the permit applicant to contact tI1e
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522W.MURDOCKAVE
AgenUOwner
OSHKOSH
WI 54901 - 2298
Telephone Number 231-9880
To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.