Loading...
HomeMy WebLinkAbout0117055-HVAC (furnace) e OSHKOSH ON THE WATER Job Address 739 FRANKLIN ST CITY OF OSHKOSH No 117055 HVAC PERMIT. APPLICATION AND RECORD Owner DELORES J AGNE Contractor PREMIUM AIR INC Fuel I~ Gas System n New ~ Forced Air I I Electric Chimney Type r) Chimney A Heat Loss r) As Approved BTU Rate r) As Per Plan Category 500 - Residential-Heating & Ventilating Create Date 11/01/2005 Plan I I Oil I I I Electric M Replace I I Solar I I Solid n Other U Radiant I I HotWater U Steam I I Suppl. e Direct Vent U Vent U AlC I I I Con. Burner I ( ) Not Applicable () Chimney B e Existing ( ) Variable ( ) Not Applicable e Other Value Value 70000 Use/Nature FRI Replace furnace - No EIV provided - A SEPARATE ELECTRICAL PERMIT IS REQUIRED FOR CONNECTION OF THIS APPLIANCE of Work - No Chimney liner being instaliedWhere an appliance is permanently disconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in the interior of the CN and to provide the appliance or appliances seNed with the req. drafl Fees: Valuation $2,281.00 Plan Approval $0.00 Permit Fee Paid $39.50 Issued By: Date 11/01/2005 0 Permit Voided I Parcelld # 1005150000 In the perfonmance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address N3225 HWY 15 HORTONVILLE WI 54944-0 Telephone Number 920-982-3323 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.