HomeMy WebLinkAbout0117055-HVAC (furnace)
e
OSHKOSH
ON THE WATER
Job Address 739 FRANKLIN ST
CITY OF OSHKOSH
No
117055
HVAC PERMIT. APPLICATION AND RECORD
Owner
DELORES J AGNE
Contractor PREMIUM AIR INC
Fuel I~ Gas
System n New
~ Forced Air
I I Electric
Chimney Type r) Chimney A
Heat Loss r) As Approved
BTU Rate r) As Per Plan
Category 500 - Residential-Heating & Ventilating
Create Date 11/01/2005
Plan
I I Oil
I
I I Electric
M Replace
I I Solar
I I Solid
n Other
U Radiant
I I HotWater
U Steam
I I Suppl.
e Direct Vent
U Vent
U AlC I
I I Con. Burner I
( ) Not Applicable
() Chimney B
e Existing
( ) Variable
( ) Not Applicable
e Other
Value
Value 70000
Use/Nature FRI Replace furnace - No EIV provided - A SEPARATE ELECTRICAL PERMIT IS REQUIRED FOR CONNECTION OF THIS APPLIANCE
of Work - No Chimney liner being instaliedWhere an appliance is permanently disconnected from an existing chimney or vent (CN), the CN shall
be resized as necessary to control flue gas condensation in the interior of the CN and to provide the appliance or appliances seNed with the
req. drafl
Fees: Valuation
$2,281.00
Plan Approval
$0.00
Permit Fee Paid
$39.50
Issued By:
Date 11/01/2005
0 Permit Voided I
Parcelld # 1005150000
In the perfonmance of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address
N3225 HWY 15
HORTONVILLE
WI 54944-0
Telephone Number
920-982-3323
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.