HomeMy WebLinkAbout0117072-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 506 AMHERST AVE
CITY OF OSHKOSH
No
117072
BUILDING PERMIT. APPLICATION AND RECORD
Owner ROBERT L SNYDER
Create Date
11/01/2005
Designer
Contractor
WASCO - WISCONSIN ALUMINUM SUPPLY C(
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
------9. Sq. Ft.
------9. Sq. Ft.
Rooms
Height
0 Ft.
D Projection I
Finished/Living
Bedrooms 0
Stories
Canopies 0
Signs
0
Garage
------9. Sq. Ft.
Baths
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Not Required
# Dwelling Units 0
# Structures
0
Park Dedication
Use/Nature SFRI Repalce 4 dbl hung windows in their existing openings and wrap trim - NO STRUCTURAL WORK
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$2,085.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 11/01/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0701940000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2546 AMERICAN DR
AgenUOwner
APPLETON
WI 54914 - 0000 Telephone Number
920-730-0099
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.