Loading...
HomeMy WebLinkAbout0117077-Building (roof) e OSHKOSH ON THE WATER Job Address 336W16THAVE CITY OF OSHKOSH No 117077 BUILDING PERMIT - APPLICATION AND RECORD --S-t.??U:i b ~f:.A"nO$~ é. l<AL--n..J~1-/ OWner rIIOI~A6 R 06 ~ Create Date 11/01/2005 Designer Contractor HICKEY ROOFING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Size Rooms Height 0 Ft. 0 Projection I Bedrooms 0 Stories Canopies 0 Baths Signs 0 Pier 0 Other 0 Treated Wood Flood Plain No Height Permit Not Required # Dwelling Units 0 # Structures 0 Zoning Finished/Living ~Sq.Ft. ~ Sq. Ft. Unfinished/Basement Garage ~Sq.Ft. Foundation . Poured Concrete 0 Floating Siab 0 Concrete Block 0 Post Occupancy Permit Not Required Park Dedication Not Required Use/Nature SFRI Tear-off roofing, repiace decking, install shingies on house. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $8,397.00 Plan Approval . $0.00 Permit Fee Paid $68.00 Park Dedication $0.00 Issued By: Date 11/01/2005 Final/D.P. DO/DO/DODO 0 Permit Voided I Parcelld # 0904770000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it 15 not a party, if you perfonn the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1427 BROAD ST Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number 426-4008 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.