Loading...
HomeMy WebLinkAbout0117094-Plumbing (water distribution) -0" OSHKOSH ON THE WATER Job Address 649 W 9TH AVE CITY OF OSHKOSH No 117094 PLUMBING PERMIT - APPLICATION AND RECORD Owner CHASE MANHATTAN MORTGAGE CORP Create Date 10/27/2005 Contractor MISCHO MECHANICAL Category 410 - Residential-Interior Plan Bathtub 0 Shower 0 Water Softner 0 Wait.St. ---.2 Shamp Sink 0 Coffee Maker 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0 Lavatory 0 Lndry Tray ---.2 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink ---.2 Wash Ftn 0 RPZ Valve ---.2 Res. Sink ---.2 Dishwasher ---.2 Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 Site Drain 0 Breakrm Sink 0 DipWelJ 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs ---.2 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Mise- 0 Fixtures Use/Nature ofWork Repair/Re-route water distribution to protect from freeze potential. Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcelld # 0 1303610000 Valuation $1,000,00 Plan Approval $0,00 Permit Fees $20.00 D.r:e!r11itVoicje.cJj Issued By Date 11/01/2005 In the performance of this work. I a9ree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to se an ne ss approvals before starting such activity. AgenUOwner FOND DU LAC Date N&J ( -¿ Signature Address 1184A W SCOTT ST WI 54937 - 0000 Telephone Number 920-907-0077 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e- Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number- Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. WATER DISTRIBUTION DA T ASHEET Date: November 1, 2005 Name: ~A\I'\'vA.(L Street: C 0"'\ L...:) C\.~ Project: Street: City: 0::. ~ l<-C:<':>~ City: 1. ~ Gallon per minute buiding demand, predominatly Flush Tank. 2. ~ Low pressure at the Main in Street. 3, ~ Lb loss ftom a ~ ft difference in elevation ftom MaIn in Street to the Water Meter. 4a. 1.1 Lb loss from a 15.0 ft 3/4" Schedule 40 Galvanized Steel ASTM A53 water service from the Main in Street to the curb Stop. - Pressure loss detemined using a C value of 125 , inside diameter of .824 and a velocity of 4.8 ft per sec. 4b, 2.5 Lb loss from a 35.0 ft 3/4" Schedule 40 Galvanized Steel ASTM A53 water service from the curb stop to the Water Meter, - Pressure loss detemined using a C value of 125, inside diameter of.824 and a velocity of 4.8 ft per sec. 5. ~ Lb loss from a 5/8in Meter 6. ~ Lbs of pressure available at the Water Meter. This value is entered in (B) below. The (A) value listed below is determined by using the following formula, then rounding the result up. A = B-(C+~+E) x 100 A. ~ Pressure available for uniform loss (psillOO feet of pipe). B. -.'!L1 Lbs of pressure available at the Water Meter. C. ---1Q,Q Pressure needed at the controlling fixture. Pressure Balanced Shower Valve D. ~ Lb loss resulting ftom a 12.0 ft difference in elevation from the Water Meter to the controlling fixture. E. ----.J! Lb pressure loss due to a serving the controlling fixture. F. ~ Ft Developed length from the 55.0 ft actual length of piping from the Water Meter to the controlling fixture. Maximun Allowable load for Copper Tube Type M, ASTM B88 Nominal Size 1/2 518 3/4 1 1 1/4 1 1/2 2 21/2 3 4 ActualI.D. .569 0 .811 1.055 1.291 1.527 2.009 2.495 2.981 3.935 Value ofC 130 130 130 130 130 130 130 130 130 130 Velocity in ft per sec. 8 8 8 8 8 8 8 8 8 8 Maximum Gpm 6.5 0 12.5 21.5 32 45 79 121 174 303 Maximum FM WSFU 0 0 4.5 7 16 38 144 369 731 1833 Maximum FT WSFU 8 0 17.5 34 60 110 270 480 776 1833 Fixture Listing Date: November 1, 2005 Name: Street: City: \(i>6'~ 1"2- ( oÃ\Ct <..J q-\v-.. Project: Street: b~,,", \.<::.01'::' t-\ City: Non Public Use Fixtures Hot Cold Total 1 Automatic Clothes Washer 1.00 1.00 1.50 1 Hose Bib, 1/2" diameter .00 3.00 3.00 1 Kitchen Sink 1.00 1.00 1.50 1 Bathtub, lavatory and water closet - FT group 2.00 3.50 4.00 Total Water Supply Fixture Units 4.00 8.50 10,00 8,0 Gallon per minute demand ofthe building. Predominatly Flush Tank 27.2 Pressure available for uniform loss. For the table use - 28.0 Maximun Allowable load for Copper Tube Type M, ASTM B88 Nominal Size 1/2 5/8 3/4 1 1 1/4 11/2 2 21/2 3 4 Actual I. D. .569 0 ,811 1.055 1.291 1.527 2.009 2.495 2.981 3,935 Value ofC 130 130 130 130 130 130 130 130 130 130 Velocity in ft per sec. 8 8 8 8 8 8 8 8 8 8 Maximum Gpm 6.5 0 12,5 21.5 32 45 79 121 174 303 Maximum FM WSFU 0 0 4.5 7 16 38 144 369 731 1833 Maximum FT WSFU 8 0 17.5 34 60 110 270 480 776 1833