Loading...
HomeMy WebLinkAbout0117041 B e OSHKOSH ON THE WATER Job Address 912 E PARKWAY AVE CITY OF OSHKOSH No 117041 BUILDING PERMIT - APPLICATION AND RECORD Owner SCOTT AIL YDIA K KRISBAHER Create Date 10/31/2005 Designer Contractor OWNER Category 140 -Interior Remodeling Plan Type . Buildin9 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: VB Rooms 0 Height ~Ft. Bedrooms 0 Stories Baths ~ Size Zoning Unfinished/Basement ~Sq.Ft. ~Sq.Ft. D Projection Canopies 0 Finished/Living Garage ~Sq.Ft. Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures -i> Use/Nature of Work FRI Replace insulation and drywall, install new wood work in mud room / back bedroom, install new back door window, and railings on talrs - NO STRUCTURAL WORK -. Owner has been made aware of prior lead hazard being identified at this property HVAC Contractor Plumbing Contractor Electric Contractor HOMEO ER Fees: Valuation ,00.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By' Date 10/31/2005 Final/D.P. 00/00/0000 D Permit Voided I Parcel Id # 1103980000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement holder(s) and t~7'7ure any necessary provals be ore startin Signature' Date IO-3(~O5 Address 912 E PARKWAY AVE OSHKOSH Wi 54901 - 4625 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.