Loading...
HomeMy WebLinkAbout0117033-Building VOID VOID e OSHKOSH ON THE WATER Job Address 520 OAK ST CITY OF OSHKOSH No 117033 BUILDING PERMIT -APPLICATION AND RECORD VOID OWner MARY P PHIPPS Create Date 10/31/2005 Designer Contractor OWNER Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~ Sq. Ft. Rooms Height Oft. 0 Projection I Finished/Living Bedrooms 0 Stories Canopies ~ Garage ~ Sq. Ft. Baths Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFRI Renew penmit #101061 to finish Single story addition and remodel of existing house. All work shall comply with applicable of Work building codes. Work is still needed in the kitchen and bathroom and a pellet stove will be installed. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $15,000.00 Plan Approval $0.00 Permit Fee Paid $99.00 Park Dedication $0.00 Issued By: Date 10/31/2005 Final/O.P. 00/00/0000 0 Permit Voided I See 117034 Parcelld # 1103640000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 520 OAK ST AgenUOwner OSHKOSH WI 54901 - 4621 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ,0 OSHKOSH ON THE WATER Job Address 520 OAK ST CITY OF OSHKOSH No 117033 BUILDING PERMIT - APPLICATION AND RECORD Owner MARY P PHIPPS Create Date 10/31/2005 Contractor OWNER Designer Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height ~ Ft. Finished/Living ~Sq.Ft. Bedrooms ~ Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Fioating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Penmlt Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature SFRI Renew penmit #101061 to finish Single story addition and remodel of existing house. All work shall comply with applicable of Work uilding codes. Work is still needed in the kitchen and batihroom and a pellet stove will be installed. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $15,000.00 Plan Approval $0.00 Permit Fee Paid $99.00 Park Dedication $0.00 Issued By: Date 10/31/2005 Final/O.P. 00/00/0000 0 PenmitVoided I Parcelld # 1103640000 In tihe performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no autihority to enforce easement restrictions of which it is not a party, if you perfonm the work described In this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 520 OAK ST AgenUOwner OSHKOSH WI 54901 - 4621 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.