HomeMy WebLinkAbout0117033-Building VOID VOID
e
OSHKOSH
ON THE WATER
Job Address 520 OAK ST
CITY OF OSHKOSH
No
117033
BUILDING PERMIT -APPLICATION AND RECORD
VOID
OWner MARY P PHIPPS
Create Date
10/31/2005
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~ Sq. Ft.
Rooms
Height
Oft.
0 Projection I
Finished/Living
Bedrooms 0
Stories
Canopies ~
Garage
~ Sq. Ft.
Baths
Signs
~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature SFRI Renew penmit #101061 to finish Single story addition and remodel of existing house. All work shall comply with applicable
of Work building codes. Work is still needed in the kitchen and bathroom and a pellet stove will be installed.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$15,000.00 Plan Approval
$0.00 Permit Fee Paid
$99.00 Park Dedication
$0.00
Issued By:
Date 10/31/2005
Final/O.P. 00/00/0000
0 Permit Voided I See 117034
Parcelld # 1103640000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 520 OAK ST
AgenUOwner
OSHKOSH
WI 54901 - 4621
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
,0
OSHKOSH
ON THE WATER
Job Address 520 OAK ST
CITY OF OSHKOSH
No
117033
BUILDING PERMIT - APPLICATION AND RECORD
Owner MARY P PHIPPS
Create Date
10/31/2005
Contractor
OWNER
Designer
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height ~ Ft.
Finished/Living ~Sq.Ft. Bedrooms ~ Stories
Garage ~Sq.Ft. Baths 0
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Penmlt
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature SFRI Renew penmit #101061 to finish Single story addition and remodel of existing house. All work shall comply with applicable
of Work uilding codes. Work is still needed in the kitchen and batihroom and a pellet stove will be installed.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$15,000.00 Plan Approval
$0.00 Permit Fee Paid
$99.00 Park Dedication
$0.00
Issued By:
Date 10/31/2005
Final/O.P. 00/00/0000
0 PenmitVoided I
Parcelld # 1103640000
In tihe performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no autihority to enforce easement restrictions of which it is not a party, if you perfonm the work
described In this permit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 520 OAK ST
AgenUOwner
OSHKOSH
WI 54901 - 4621
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.