Loading...
HomeMy WebLinkAbout0117039-Building (wrap windows/repair garage) e OSHKOSH ON THE WATER Job Address 839841 JEFFERSON ST CITY OF OSHKOSH No 117039 BUILDING PERMIT - APPLICATION AND RECORD Owner KELLY/ELIZABETH BURNETT Create Date 10/31/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms Height 0 Ft. Bedrooms 0 Stories Size Zoning Finished/Living ~ Sq. Ft. ~Sq.Ft. 0 Projection I Unfinished/Basement Canopies 0 Garage ~Sq.Ft. Baths 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit # Structures Use/Nature SFRI Wrapping windows and repairing the garage. ofWork # Dwelling Units ~ 0 Park Dedication HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: cy¡ Date 10/31/2005 Final/O.P. 00/00/0000 0 Permit Voided i Parcelld # 1000960000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to ,secure any necessary approvals before starting such activity. Signature 'Y- '7 ~~..".a-.~ -- ::;;/ Agenl/Owner Date -< Address 200WLlNWOODAVE OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.