Loading...
HomeMy WebLinkAbout2005-Building G OSHKOSH ON THE WATER Job Address 3001 S WASHBURN ST CITY OF OSHKOSH No 117266 BUILDING PERMIT - APPLICATION AND RECORD Owner FIRST HORIZON GROUP LIMITED PTNSHP Create Date 11/14/2005 Designer Contractor ELDER-JONES GENERAL CONTRACTOR Plan 07-93-1005 Category 232 - Alteration Stores & Customer Service Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size FinishediLiving -----'! Sq. Ft. -----'! Sq. Ft. Rooms Height 0 Ft. D Projection I Unfinished/Basement Bedrooms Stories Canopies 0 Garage -----'! Sq. Ft. Baths 0 Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Required Park Dedication Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Use/Nature D80 - Old Navy - Combine spaces D75 and D80 into one tenant space. remodel for this tenant. ofWork Plumbing Contractor UNKNOWN HVAC Contractor UNKNOWN??? Electric Contractor UNKNOWN???? Fees: Valuatio Plan Approval $0.00 Permit Fee Paid $754.00 Park Dedication $0.00 Issued By: Date 11/14/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1329420000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ~~ Date //.~o/./c..ç- Address 1120 E 80TH ST Agent/Owner BLOOMINGTON MN 55420 - 0000 Telephone Number 952-854-2854 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ~ OJHKOfH City of Oshkosh Division ofInspection Services 215 Church Avenue PO Box 1130 Oshkosh WI 54903-1130 www.ci.oshkosh.wi.us October 26, 2005 Robert Tindall Callison Architechts, Inc 1420 FiftltAve # 2400 Seattle WA 98101-2343 Duane Henderson Henderson Engineers Inc 8325 Lenexa Dr, Suite 400 Lenexa KS 66214-1654 Felice Arredondo Prime Retail 217 E Redwing, 20th Floor Baltimore MD 21202 Site: DD80 /ÕO7r5' Old Navy Ontlet # 1734 3001 S Wshburn St Oshkosh WI 54904 For: Description: Tenant space alterations Object Type: Bnilding & HV AC Only Class of Construction: DB - 14,573 sq ft; SprinkIered Occupancy: M: Mercantile 1 Retail Maximum No of Occupants: 379 Plan Number: Q8-93-1005 The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in Chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements Key Item(s) 1 Conditions: mc 711.3 Any penetrations of fire rated assemblies are required to be protected with a listed firestopping system that matches the rating of the wall assembly being penetrated. Copies ofthefirestopping systems are required to be provided at the time of inspection. mc 906.11 IFC 906.3 The maximum travel distance allowed to a fire extinguisher is 75 feet. . mc 1003.2.10 Exit signs are required to be installed per this section mc 1003.2.11 Means of egress illumination is required to be installed per this section. All paths of egress through The Retail Display area are required to have adequate emergency lighting to meet the performance requirements ofIBC 1003.2.11.3. COMM 62.1109 (12) Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. IFC 901.4 Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required fire protection systems shall be extended, altered, or augmented as necessary to maintain and continue protection whenever the building is altered, remodeled or added to. Alterations to fire protection systems shall be done in accordance with applicable standards. mc 1101.21 ANSI A117.1-308.2 & 3 -Mechanical system controls shall be located a maximurn of 48" above the finished floor if the floor space allows a forward approach by a wheel chair or if the clear space allows a parallel approach. Page 1 of4 IMC 302.1 The building or structure shall not be weakened by the installation of mechanical systems. VerifY that structural modifications are completed per calculations and plans submitted and drift loading is not required to be considered. Comm 5.34 No person may perform structural welding unless the person holds a registration issued by Department of Commerce. Provide welders registration numbers for all people doing welding on this project. IMC 304.9 Guards. Guards shall be provided where appliances, equipment, fans or other components that require service are located within 10 feet (3048 mm) of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches (762 mm) above the floor, roof or grade below. The guard shall extend not less than 30 inches (762 mm) beyond each end of such appliance, equipment, fan or component and the top of the guard shall be located not less than 42 inches (1067 mm) above the elevated surface adjacent to the guard. The guard shall be constructed so as to prevent the passage of a 21-inch- diameter (533 mm) sphere and shall comply with the loading requirements for guards specified in the International Building Code. VerifY compliance with this code section IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment and appliances requiring access are installed on roofs or elevated structures at a height exceeding 16 feet (4877 mm), such access shall be provided by a permanent approved means of access, the extent of which shall be ftom grade or floor level to the equipment and appliances' level service space. Such access shall not require climbing over obstructions greater than 30 inches (762 mm) high or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal (33-percent slope). IMC 306.6 Sloped roofs. Where appliances are installed on a roof having a slope on units vertical in 12 units horizontal (25-percent slope) or greater and having an edge more than 30 inches (762 mm) above grade at such edge, a level platform shall be provided on each side of the appliance to which access is required by the manufacturer's installation instructions for service, repair or maintenance. The platform shall not be less than 30 inches (762 mm) in any dimension and shall be provided with guards in accordance with Section 304.9.. VerifY compliance with this code section IMC 401.5.1 Mechanical and gravity outside air intake openings shall be located a minimum of 10 feet ftom any hazardous or noxious contaminant such as vents, chinmeys, plumbing vents, streets,-alleys, parking lots and loading docks. IMC 405.1 Mechanical ventilation systems shall be provided with manual or automatic controls that will operate such systems whenever the spaces are occupied. Air conditioning systems that supply required ventilation air shall be provided with controls designed to automatically maintain the required outdoor air supply rate during occupancy. IECC 803.3.3.3 Off-hour controls. Each zone shall be provided with thermostatic setback controls that are controlled by either an automatic time clock or programmable control system. IFGC 401 /Comm 65.0400 All gas piping and gas piping installations shall comply with NFP A 54, National Fuel Gas Code. IFGC 619.2 Support. Suspended-type unit heaters shall be supported by elements that are designed and constructed to accommodate the weight and dynamic loads. Hangers and brackets shall be of noncombustible material. IFGC 619.4 Clearance. Suspended-type unit heaters shall be installed with clearances to combustible materials of not less than 18 inches (457 mm) at the sides, 12 inches (305 mm) at the bottom and 6 inches (152 mm) above the top where the unit heater has an intemal draft hood or I inch (25 mm) above the top of the sloping side of the vertical draft hood. Where the flue gases are vented horizontally, the 6-inch (152 mm) clearance shall be measured ftom the draft hood of vent instead of the rear wall of the unit heater. Clearances for servicing all unit heaters shall be in accordance with the manufacturer's installation instructions. Exception: Unit heaters listed for reduced clearance shall be permitted to be installed with such clearances in accordance with their listing and the manufacturer's instructions. . '. . It\hriwm\2005 Comm Plan Review\'Q7-93-IO()5 3001 S Wshbum $1 IIV"C & BI.DG.duç Page20f4 Comm 161 NEC This plan review does not inclnde a complete review of electrical plans. Please note there appears to be conflicting information in mechanical and electrical plans as to voltage of mechanical equipment, and voltage available. (Based on riser diagram it would appear that 480 volts is not available, however equipment wiring schedule list 480 volt equipment) Additionally there may be an issue with grouping requirements for switchboard disconnects base on review of riser diagram indicating the disconnects are not grouped. Please contact Kevin Benner - Electrical Inspector (920) 236-5046 for additional information on this issue. Comm 80 This plan review does not include plumbing. Prior to installation of plumbing, plans and calculations are required to be submitted and approved if required by Comm 82.20. (greater than 16 piumbing fixtures, or specific item listed in Table 82.20-2) MUN 30 - This review does not include review for exterior signage, which will require separate review by the planning department prior to permit issuance for exterior sigoage. Contact David Buck - Associate planner (920) 236-5062 for additional information on sigo permit submittal requirements Comm 61.31(4) Revisions to approved plans. All proposed revisions and modifications which involve rules under this code and which are made to construction documents that have previously been granted approval by the department or its authorized representative, shall be submitted to the office that granted the approval. All revisions and modifications to plans shall be approved in writing by the department or its authorized representative prior to the work involved in the revision or modification being carried out. A revision or modification to a plan, drawing or specification shall be sigoed and sealed in accordance with Comm 61.31(1). SUBMIT: MUN 30-35 (1)(5) All rooftop and ground level mechanical equipment and utilities shall be fully screened ftom view of any street or residential zoning district. Contact David Buck - Associate planner (920) 236- 5062 for additional information on screening requirements. All screening shall be properly anchored in place to resist wind loads. Additionally mc 1608.8 Roof projections - Drift loads due to mechanical equipment, penthouses, parapets and other projections above the roof shall be determined in accordance with Section 1.8 of ASCE 7. Provide calculations for drift loading - NO HV AC PERMIT WILL BE ISSUED PRIOR TO SCREENING PLANS BEING APPROVED IFC 901.4 Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required fire protection systems shall be extended, altered, or augmented as necessary to maintain and continue protection whenever the building is altered, remodeled or added to. Alterations to fire protection systems shall be done in accordance with applicable standards. Sheet M4-0 provides only a suggested layout for sprinkler system. - Submit plans and calculations for fire sprinkler modifications. Comm 61.30(3) This review does not include lighting. Comm 63.0001 Prior to installation, lighting plans and calculations shall be prepared in compliance with the code. Please submit lighting work sheets. IECC 503.3.3.1 [Comm 63.0503(2)(1)] Balancing and documentation of the HV AC system shall conform to the IMC. Balancing report required to be submitted prior to final occupancy being allowed. . Comm 61.50 (4) Supervision. Prior to the initial occupancy of an alteration the supervising professional shall file a compliance statement form SBD-9720 with this office. A copy of the approved plans, specifications, and this letter shall be on-site during construction. All permits are required to be obtained prior to commencement of work. H;\brian¡¡'2005 Comm I'IGn Reviow,'Q7-93-tOO5 3001 S W,hborn 51 HVAC & BLDGdoç Page30f4 In granting this approval the City of Oshkosh Inspection Services Department reserves the right to require changes or additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this review shall relieve the designer of the responsibility for designing a safe building, structure, or component. C this correspondence may be made to me at the number listed below or the address on this letterhead. BnanNoe Building Systems Consultant (920) 236-5051 Monday-Friday 7:30 A.M. to 8:30A.M and 12:30 A.M to 1:30 P.M. bnoe@ci.oshkosh.wi.us cc: Property file David Buck - Associate Planner Kevin Benner - Electrical Inspector Fee Required $ Fee Received $ Balance Due $ 1100.00 1100.00 0.00 R\b,i.nn\2005 O,mm Plan Reviowi'Q7-93-1005 3001 S W,hhnm 51 I1VAC & BLDO.ùnç Page40f4