HomeMy WebLinkAbout2005-Building
G
OSHKOSH
ON THE WATER
Job Address 802 VIOLA AVE
CITY OF OSHKOSH
No
117013
BUILDING PERMIT - APPLICATION AND RECORD
Owner LINDA A NEMSCHOFF
Create Date
10/28/2005
Designer
Contractor
BENABBY HOMES INC
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height 0 Ft.
D Projection I
Canopies
Finished/Living
Bedrooms 0
Stories
Garage
~Sq.Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
1# Dwelling Units 0
1# Structures
~
Use/Nature SFRI Remodeling the kitchen, new cabinets, flooring, drywall, installing a new bumped out window, relocating appliances, and opening
of Work orne walls per the plan submitted. Headers will be sized to carry all loads imposed- cales in the flle.
HVAC Contractor
BREWER HEATING
Plumbing Contractor
FIELDS PLUMBING
Electric Contractor
SCHOMMER ELECTRICAL CONTRACTING I
Fees: Valuation
Issued By: ~ V'---
$25,000.00 Plan Approval
$0.00 Permit Fee Paid
$139.00 Park Dedication
$0.00
Date 10/2812005
FinaUO.P. 00/00/0000
D Permit Voided I
Parcelld 1# 1220690000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this per~" i tion within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and t~é"cure a ne ry ap before starting such activity.
Signature// ,/
WI 54904 - 0000
Datey
Telephone Number 920-426-1598
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
',' /d
-', .