Loading...
HomeMy WebLinkAbout0116985-Building (roof) e OSHKOSH ON THE WATER Job Address 17 WAUGOO AVE CITY OF OSHKOSH No 116985 BUILDING PERMIT - APPLICATION AND RECORD Owner DEBRA J TOMAN/SANDRA PRUNTY Create Date 10/27/2005 Designer Contractor GIBSON BROTHERS ROOFING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~ Sq. Ft. Rooms Height 0 Ft. D Projection I Finished/Living Bedrooms Stories Canopies 0 Garage ~Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Fioating Siab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Not Required Flood Plain ~ # Dwelling Units --'> Height Permit Not Required Park Dedication # Structures 0 Use/Nature ofWork omm/ Install 1/2" insuiation mechanically fastened to roof. and fully adhered .060 mill rubber roof over existing roof. install new roof rain connected to existing drain pipe below roof. NO STRUCTURAL WORK. HVAC Contractor Plumbing Contractor Electric Contractor ,570.00 Plan Approval $0.00 Permit Fee Paid $56.00 Park Dedication $0.00 Issued By: Date 10/27/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0200140000 In the performance of this work i agree to perform all work pursuant to rules goveming the described construction. Whiie the City of Oshkosh has no authority to ß"fprce easement restrictions of which it is not a party. if you perform the work described in tl)is'Penmit apþJicatlon witftin an.éaseÍnent, the City strongly urges the permit appiicant to contact the easement hOider(S)anrt~...~.etu¡e.¡'.'?~le.cessar;,~pprðva beY'~lngsuc~activity. ¡/]!Æ-. . :/J /h Signature \//l / ¡, ZlW¿;l/'-- Date (~1/1( ¡ ¿; !./v II Agent/Owner I Address 856 COUNTY ROAD I OSHKOSH WI 54902 - 8876 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do We gain entry), your Name and Phone Number. Unless specified otherwise, We will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.