Loading...
HomeMy WebLinkAbout0117005 B 0 OSHKOSH ON THE WATER Job Address 894 OLSON AVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 117005 Owner RUTH WIRTH Create Date 10/27/2005 Designer Contractor WINDOW WORLD OF MILWAUKEE Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 0 Pier 0 Other 0 Treated Wood Size Zoning Unfinished/Basement ----2 Sq. Ft. ----2 Sq. Ft. 0 f2()jection I Finished/Living Canopies Garage ----2 Sq. Ft. Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature r"FRIlnstall 3 replacement (same size & location) windpws and. replace an existing patio do}')r (groupcj floor. same opening)! NO of Work ,STRUCTURAL WORK. Permit Issued to Homeowners ~I' S-Iev e w: ~'<61. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: / ~ $2,100.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 10/27/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1252120000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secur necessary approv is b r starting such activity. Signature AgenUOwner OSHKOSH Date /'1.4~k- Address 894 OLSON AVE WI 54901 - 1154 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.