HomeMy WebLinkAbout0116993-HVAC (computer lab)
e
OSHKOSH
ON THE WATER
Job Address 108 W NEW YORK AVE
CITY OF OSHKOSH
HVAC PERMIT -APPLICATION AND RECORD
No
116993
Owner
OSH AREA SCHL DIST MERRILL
Create Date 09/26/2005
Plan 05-84-0905
Contractor GARTMAN MECHANICAL SERVICES
I I Gas I 1011
Fuel
System [7l New
~ Forced Air U Radiant
1 1 Electric 1 1 HotWater
Chimney Type K) Chimney A () Chimney B
Heat Loss K ) As Approved ( ) Existing
BTU Rate K ) As Per Plan () Variable
Category 512 -Ind. & Comm-Both
1,(1 Electric
1 1 Solar
I 1 Solid
n Replace
U Steam
I 1 Suppl.
n Other
( ) Direct Vent
~ PJC 1
I I Con. Burner 1
. Not Applicable
U Vent
. Not Applicable
. Other
Value
Value
Use/Nature omputer Lab - East Wing. Add HVAC system for this room. 12KW Electric Heat. 4T cooling.SCREENING PLAN TO BE SUBMITTED
of Work NITHIN 30 DAYS PER LETTER DATED 10/17/05 FROM DWAYNE TURPIN - OASD.
Fees: Valuation
$10,985.00
Plan Approval
$0.00
Permit Fee Paid
$165.00
Issued By:
Date 10/27/2005
0 Permit Voided I
Parcelld # 1500680000
In the performance of this work, I agree to perform ail work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described In this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address
PO BOX 2264
OSHKOSH
WI 54903 - 2264 Telephone Number
(920) 231-5530
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
FROM :~1aintenance
FAX NO. : 4240475
Oct. 24 2005 02:30PM Pi
æ
Oshkosh Area School District
Department of Buildings and Grounds
137 Soudl Campbell Road -Oshkosh, WI 54901- Phone (920) 424-0135
Dwayne J. Turpin
Director of Buildings 8< Grounds
Lawrence J. Zentner
Custodial Supervisor
October 17,2005
Mr. David Buck
City of Oshkosh
215 Church Ave.
Oshkosh, WI 54903-Il30
RE: Metrill School Computer Room Project
Dear David:
Per our discussion, The Oshkosh Area School District agrees to provide a screening plan
for the referenced project The plan would be submitted within 30 days of setting the air
conditioning unit and would meet all requirements as outlined in the City'~ letter dated
September 26, 2005.
If you have any questions, you may contact my mobile at 379-1792.
Thank you for your continued support
Sincerely, /)
/~--ç~
Dwayne Turpin
Director of Buildings and Grounds
Oshkosh Area School District
l.ø-;.ß-O(""
~
~
OJHKQfH
ON THE WATER
City of Oshkosh
Division of Inspection Services
215 Church Avenue
PO Box 1130
Oshkosh WI 54903-1130
www.ci.oshkosh.wi.us
September 26, 2005
Karen Casey
Gustave A Larson Company
2669 Industrial
Green Bay, WI 54304
Gartruan Mechanical
520 W South Park Ave
Oshkosh, WI 54901
Swayne Turpin
Director of Buildings & Grounds
Oshkosh Area School District
137 S Campbell Rd
Oshkosh WI 54904
Site:
Merrill Middle School
108 WNewYorkAve
Oshkosh WI 54901
For:
Description: Computer Lab
Object Type: BV AC only
Occupancy: E: Educational
Plan Nnmber: Q5-94-0905
The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and
Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in Chapter
101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements
Key Hem(s) / Conditions:
.
302.1 The building or structure shall not be weakened by the installation of mechanical systems. Verify
that existing strncture is capable of supporting the additional weight of the proposed rooftop
equipment.
IMC 304.9 Guards. Guards shall be provided where appliances, equipment, fans or other components that
require service are located within 10 feet (3048 mm) of a roof edge or open side of a walking surface and
such edge or open side is located more than 30 inches (762 mm) above the floor, roof or grade below. The
guard shall extend not less than 30 inches (762 mm) beyond each end of such appliance, equipment, fan or
component and the top of the guard shall be located not less than 42 inches (1067 mm) above the elevated
surface adjacent to the guard. The guard shall be constructed so as to prevent the passage of a 21-inch-
diameter (533 mm) sphere and shall comply with the loading requirements for guards specified in the
International Building Code.
IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment and
appliances requiring access are installed on roofs or elevated structures at a height exceeding 16 feet (4877
mm), such access shall be provided by a permanent approved means of access, the extent of which shall be
from grade or floor level to the equipment and appliances' level service space. Such access shall not
require climbing over obstructions greater than 30 inches (762 mm) high or walking on roofs having a
slope greater than 4 units vertical in 12 units horizontal (33-percent slope).
Cmnm Pkm Review,'-Q5-84.0i)O51ùg IV New Yürk AI-e ITVAC Only.dü,
Page 1 of2
IMC 401.5.1 Mechanical and gravity outside air intake openings shall be located a minimum of 10 feet
from any hazardous or noxious contaminant such as vents, chimneys, plumbing vents, streets, alleys,
parking lots and loading docks.
IMC 405.1 Mechanical ventilation systems shall be provided with manual or automatic controls that will
operate such systems whenever the spaces are occupied. Air conditioning systems that supply required
ventilation air shall be provided with controls designed to automatically maintain the required outdoor air
supply rate during occupancy.
IECC 803.3.3.3 Off-hour controls. Each zone shall be provided with thermostatic setback controls that
are controlled by either an automatic time clock or programmable control system.
Comm 61.31(4) Revisions to approved plans. All proposed revisions and modifications which involve
rules under this code and which are made to construction documents that have previously been granted
approval by the department or its authorized representative, shall be submitted to the office that granted the
approval. All revisions and modifications to plans shall be approved in writing by the department or its
authorized representative prior to the work involved in the revision or modification being carried out. A
revision or modification to a plan, drawing or specification shall be signed and sealed in accordance with
Comm 61.31(1).
MUN 30-35 (1)(5) All rooftop and ground level mechanical equipment and utilities shall be fully screened
from view of any street or residential zoning district. Contact David Buck - Associate planner (920) 236-
5062 for additional information on screening requirements. All screening shall be properly anchored in
place to resist wind loads. Additionally IBC 1608.8 Roofprojections - Drift loads due to mechanical
equipment, penthouses, parapets and other projections above the roof shall be determined in accordance
with Section 7.8 of ASCE 7. No permit can be issued until a screening plan is submitted and approved.
As a result the fees for the plan review have been processed anjthe remaining $165.00 has been
deposited into your account, to be used to issue the permit when screening plans have been approved.
SUBMIT:
IECC 503.3.3.7 [Comm 63.0503(2)(t)] Balancing and documentation of the HV AC system shall conform
to the IMC. Balancing report required to be submitted prior to final occupancy being allowed.
. Comm 61.50 (4) Supervision. Prior to the initial occupancy of an alteration the supervising professional
shall file a compliance statement form SBD-9720 with this office.
A copy of the approved plans, specifications, and this letter shall be on-site during construction. All permits are required to
be obtained prior to commencement of work.
In granting this approval the City of Oshkosh Inspection Services Department reserves the right to reqnire changes or
additions shonld conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this
review shan relieve the designer of the responsibility for designing a safe building, structure, or component.
cc: Property file
Fee Required $
Fee Received $
Balance Due $
230.00
230.00
0.00
¡¡'-'.briann\2005 Cçmm Phm Rnv,nvw'.Q5.84.WO5 108 IV Nnw Y.."k A,.e IlVAC' Only.de"
Page 2 of2