HomeMy WebLinkAbout2005-HVAC
e
OSHKOSH
ON THE WATER
Job Address 421 N MAIN ST
CITY OF OSHKOSH
HVAC PERMIT -APPLICATION AND RECORD
No
116991
Owner
421 NORTH MAIN STREET LLC
Create Date 10/27/2005
Plan Q7-97-1005
I 1 Oil
Category 512 -Ind. & Camm-Both
I 1 Electric
1 I Solid
Contractor
CONDON TOTAL COMFORT
Fuel
1"'1 Gas
PI New
I I Solar
n Replace
U Steam
I I Suppl.
n Other
System
U Vent
BTU Rate
. As Approved
K ) As Per Plan
( ) Chimney B
( ) Existing
. Direct Vent
~PJC I
I I Con. Burner I
( ) Not Applicable
~ Forced Air
I I Electric
Chimney Type K) Chimney A
U Radiant
I I HotWater
( ) Variable
( ) Not Applicable
. Other
Value
Heat Loss
Value
Use/Nature omm/ Install 2 fumaces, and 2 PJC's as per State Approved plans transaction ID # 1200322MUN 30-35 (1)(5) All roof top and ground level
of Work l1echanlcal equipment and utilities shall be fully screened from view of any street or residential zoning district. IF AC UNITS ARE VISiBLE
FTER INSTALL TION SCREENING IS REQUIRED TO BE PROVIDED WITHIN 30 DAYS
Fees: Valuation
$12,500.00
Plan Approval
$0.00
Penmit Fee Paid
$180.00
Issued By:
Date 10/27/2005
D Permit Voided I
Parcelld # 0700080000
In the performance of this work, I agree to perfon11 all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address
PO BOX 184
RIPON
WI 54971 -184
Telephone Number
920-748-5050
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.