HomeMy WebLinkAbout0116999-Building
e
OSHKOSH
ON THE WATER
Job Address 1411 GRAHAM AVE
CITY OF OSHKOSH
No
116999
BUILDING PERMIT - APPLICATION AND RECORD
Owner PAUL GIDDINGS
Create Date
10/27/2005
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
0
Height
0 Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies 0
Garage
~Sq.Ft.
Baths
Signs
~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ~
# Structures
~
Use/Nature SFR/ Gut and remodel 2nd floor bedrooms and hallway - Mln 50 % floor area to have 7 It min clg height, 32" door being installed, install
of Work insulation maintaining air space at rocf sheathing, install drywall finish. Install 9 vinyl replacement windows in - existing openings, NO
~TRUCTURAL CHANGES.
HVAC Contractor
Plumbing Contractor
Electric Contractor
$0.00 Permit Fee Paid
$38.00 Parlk Dedication
$0.00
Issued By:
Date 10/27/2005
Final/D.P. 00/00/0000
D Permit Voided I
Parcelld # 1600660000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and ec ~c ss ryapprovals before starting such aclivity. 1/'\/'ì7/~
Signature ' f Date f!::/L,r/~'
, I
Agent/Owner
Address 1411 GRAHAM AVE
OSHKOSH
WI 54902 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.