Loading...
HomeMy WebLinkAbout0116999-Building e OSHKOSH ON THE WATER Job Address 1411 GRAHAM AVE CITY OF OSHKOSH No 116999 BUILDING PERMIT - APPLICATION AND RECORD Owner PAUL GIDDINGS Create Date 10/27/2005 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. D Projection I Finished/Living Bedrooms Stories Canopies 0 Garage ~Sq.Ft. Baths Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ~ # Structures ~ Use/Nature SFR/ Gut and remodel 2nd floor bedrooms and hallway - Mln 50 % floor area to have 7 It min clg height, 32" door being installed, install of Work insulation maintaining air space at rocf sheathing, install drywall finish. Install 9 vinyl replacement windows in - existing openings, NO ~TRUCTURAL CHANGES. HVAC Contractor Plumbing Contractor Electric Contractor $0.00 Permit Fee Paid $38.00 Parlk Dedication $0.00 Issued By: Date 10/27/2005 Final/D.P. 00/00/0000 D Permit Voided I Parcelld # 1600660000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and ec ~c ss ryapprovals before starting such aclivity. 1/'\/'ì7/~ Signature ' f Date f!::/L,r/~' , I Agent/Owner Address 1411 GRAHAM AVE OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.