HomeMy WebLinkAbout0116936-Building (roof)
0
OSHKOSH
ON THE WATER
Job Address 1004 WAUGOO AVE
CITY OF OSHKOSH
No
116936
BUILDING PERMIT -APPLICATION AND RECORD
Owner HOWARD WENZEL LIFE ESTATE
Create Date
10/25/2005
Desi9ner
Contractor
IMPRESSIVE ROOFING AND SiDING INC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
0
Height
0 Ft.
0 Projection I
Finished/Living
Bedrooms 0
Stories
Canopies 0
Garage
~ Sq. Ft.
Baths
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units a
# Structures
0
Park Dedication
Use/Nature SFRI tear-off roofing, replace decking, install new shingled, gutters and downspouts on house and garage
ofWork
HVAC Contractor
Plumbing Contractor
Electric Contractor
$7,958.32 Plan Approval
$0.00 Permit Fee Paid
$62.00 Park Dedication
Fees: Valuation
$0.00
Issued By:
Date 10/25/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0204130000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 2786
Agent/Owner
APPLETON
WI 54912 - 2786
Telephone Number
232-1669
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.